Laserfiche WebLink
5-10-99 Weekly Field Report Job No.986011.0, <br /> VIER No. 1 VECTOR ENGINEERING, INC. Page No. z <br /> Friday May 14, 1999 <br /> Allied—Utilized 2 rock trucks loaded from the MWU B stockpile with a 325 excavator to haul subgrade material to the <br /> eastern slope of cell WMU-99. Allied utilized a D8 to spread and compact the material on the steeper slopes. Allied <br /> utilized a water truck to maintain moisture conditioning of the subgrade material. <br /> Guinn—Continues to expose the liner tie in along the south side of Cell WMU-98 with the excavator and 2 laborers. <br /> Guinn is filling low areas in the mixing pad area utilizing the material from.last years mixing pad. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: �S <br />