My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8-30-99 Weekly Field Report Job No. 986011.0 <br /> WFR No.17 VECTOR ENGINEERING, INC. Page No. <br /> Project Name: Client Or Owner: 17 <br /> Forward Land Fill Allied Waste <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stefani,Jr 8-30-99 TO 9-2-99 Mon—Sun <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Grading Contractor Superintendent Or Foreman: <br /> Robert Burns Bill Geary <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> Sandy clayey silt Cloudy Cool FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck.GSE <br /> 544E John Deere loader,Gradall. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Monday August 30, 1999 <br /> Guinn: Guinn continued to backfill the anchor trench around the leachate3 impoundment pond. Guinn started <br /> to place the 14" lift of earthfill in the leachate impoundment pond per revised plan. Guinn utilized the 623 to <br /> haul the material from the stockpile just north of the pond. Guinn had a laborer full time watching for <br /> wrinkles as the D4H dozer built the access ramp and spread the material onto the pond floor. <br /> GSE: GSE completed the boots on the lysometers and the 12" riser pipe and all repairs needed on the <br /> geomembrane in the leachate impoundment pond. GSE completed the repair needed on the eastern slope of <br /> cell WMU D-99. GSE completed vacuum testing of all the,repairs. GSE installed the wind vents. <br /> Tuesday August 31, 1999 <br /> Guinn: Guinn completed backfilling the anchor trench around the leachate impoundment pond. Guinn <br /> continued to place the 14" lift of earthfill in the leachate impoundment pond. Guinn had a laborer part time <br /> watching for wrinkles as the dozers spread the material onto the pond floor. Guinn graded the southern <br /> roadway and set the drainage ditch. <br /> Wednesday September 1, 1999 <br /> Guinn: Guinn completed backfilling the anchor trench around the leachate impoundment pond. Guinn <br /> continued to place the 14" lift of earthfill in the leachate impoundment pond. Guinn had a laborer full time <br /> watching for wrinkles as the dozers spread the cover material onto the pond floor. Guinn imported some <br /> questionable material but did not place the fill on the pond floor. <br /> Thursday September 2, 1999 <br /> Guinn: Guinn completed placement of the 14" earthfill material on the leachate impoundment pond floor. <br /> Guinn utilized the 623 to haul the material from the stockpile. Guinn cleaned out the southern channel at the <br /> toe of the Ashpit and at the western end of the roadway crossing. Guinn installed the 12" riser pipe cap. <br /> Guinn installed the force main pipe bracket just to the north of the pond. Guinn placed 3 fence posts with <br /> ropes tied in knots every 20" on all 3 sides of the leachate impoundment pond. Guinn performed general <br /> grading around the site. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: <br />