Laserfiche WebLink
PROGRESS MEETING NO. I <br /> MEETING MINUTES— 5125199 <br /> FORWARD, INC. LANDFILL <br /> Job No. 986011.02 <br /> Forward, Inc. Landfill: WMU D-99, Class 11 Leachate Impoundment, and Closure of <br /> Eastern Ash Pit and WMU Interim F <br /> To: Duane Meadows, Guinn <br /> Pete Keller, Allied <br /> Butch Stefani, Forward <br /> Ben Dell-Era, Vector <br /> cc: Kevin Basso, Forward <br /> Mike Kaiser, Allied <br /> Jeff Affonso, Guinn <br /> Tim Guinn, Guinn <br /> Sangeeta Lewis, Lewis Engineering <br /> From: Scott Purdy, Vector Engineering, Inc. <br /> Subject: Weekly Progress Meeting Minutes, May 25, 1999 <br /> Attendees: <br /> Duane Meadows, Guinn <br /> Tim Guinn, Guinn <br /> Butch Stefani, Forward <br /> Scott Purdy, Vector <br /> Ben Dell-Era, Vector <br /> ACTION ITEMS <br /> > Vector will contact GSE concerning samples of HDPE geomembrane for large scale <br /> direct shear testing. <br /> ➢ Vector will obtain samples of the mixed NARCO and on-site soils and ship it to <br /> Vectors laboratory for large scale direct shear testing. <br /> > Vector will contact GSE regarding scheduling of liner installation. <br /> ➢ Guinn will provide additional samples of gravel to Vector for sieve testing. <br /> > Forward will provide Guinn with a location to stockpile the aggregate base removed <br /> from the first bench around D-99. <br /> > Butch will review the progress payment procedures for Allied and contact Scott with <br /> the schedule and submittal requirements. <br /> ➢ Vector will forward a submittal register to GSE. <br />