My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vector will contact GSE to determine when geosynthetics will arrive on site and will <br /> contact Butch. <br /> ➢ Guinn will add excavation of the anchor trenches to their progress schedule. <br /> 1. Comments from previous meeting: <br /> A. On finish subgrade: Guinn will survey final subgrade prepared by Forward. If <br /> the surveying shows areas that need additional work, they will be discussed <br /> and it will be determined whether Forward or Guinn does the work. <br /> B. Leachate impoundment: Forward is still waiting to hear from DTSC. Guinn <br /> will be notified and until that time it should be left alone. <br /> C. Bridge: Butch said that approval for taking soil samples has been given. The <br /> soil results should be ready in two weeks. The Planning Commission may <br /> approve the bridge by the end of July. <br /> D. Tim Guinn will check to see that Guinn completed Allied's health and safety <br /> declaration. <br /> 2. Review of work progress since previous meeting: <br /> A. Forward has been placing subgrade on ash pit and eastern slopes. <br /> B. I Guinn will bring in a surveyor to stake control on bottom and road on <br /> backside. At the same time, they will "as-built" the ash pit and eastern slopes. <br /> C. Guinn is excavating cell D-99 and it should be complete by the first of next <br /> week. <br /> D. Guinn dug and found the leachate line along the western side of the <br /> construction area. It will be cut and capped. <br /> 3. Projected schedule: <br /> A. Guinn will prepare final subgrade and excavate the trenches for the collection <br /> lines by the first of next week. <br /> B. Clay mixing will start next Tuesday. <br /> C. The ramp on the western side of D-99 may not be complete by next week but <br /> it will not impact the schedule. <br /> D. Survey of subgrade preparation will be done and back to Vector for review in <br /> about 2 — 3 weeks from today. <br /> E. It should take two days to mix the Narco clay with the on-site soils. <br /> F. Guinn will take Saturday, Sunday, and Monday off for the holiday. <br /> n:/986011.01/Weekly Progress Meetings/05-25-99 Meeting 1.doc Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.