Laserfiche WebLink
PROGRESS MEETING NO. 5 <br /> MEETING MINUTES 7113199 <br /> FORWARD, INC. LANDFILL <br /> Job No. 986011.02 <br /> Forward, Inc. Landfill: WMU D-99, Class II Leachate Impoundment, and Closure of <br /> Eastern Ash Pit and WMU Interim F <br /> To: Duane Meadows, Guinn <br /> Pete Keller, Allied <br /> Butch Stefani, Forward <br /> Ben Dell-Era, Vector <br /> cc: Kevin Basso, Forward <br /> Mike Kaiser, Allied <br /> Jeff Affonso, Guinn <br /> Tim Guinn, Guinn <br /> Sangeeta Lewis, Lewis Engineering <br /> From: Scott Purdy, Vector Engineering, Inc. <br /> Subject: Weekly Progress Meeting Minutes, July 13, 1999 <br /> Attendees: <br /> Butch Stefan!, Forward <br /> Bill Geary, GSE <br /> Duane Meadows, Guinn <br /> Scott Purdy, Vector <br /> Ben Dell-Era, Vector <br /> ACTION ITEMS <br /> ➢ Butch will contact Kleinfelder and Environmental Health regarding the monitoring <br /> abandonment to coordinate the permits and regulatory observation. <br /> ➢ Vector will have Precision Laboratories conduct the conformance testing on the <br /> smooth HDPE liner for the impoundment. <br /> ➢ GSE will ship an additional roll of smooth liner that is needed for the impoundment. <br /> ➢ Vector needs to coordinate with a driller to abandon the monitoring well in the <br /> impoundment. Vector will be the prime and subcontract the work to the driller. <br /> 1. Comments from previous meeting: <br /> No comments from previous meeting. <br />