My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Review of work progress since previous meeting: <br /> A. WMU D-99 is lined except for the south slope. <br /> B. Guinn has begun to place LCRS drainage material over the floor of the D-99 <br /> cell. <br /> C. The geotextile filter has also been placed over a portion of the drainage <br /> material. <br /> D. GSE is currently lining the ash pit. <br /> E. The LCRS collection pipes have been installed. <br /> F. All of the geosynthetics have been logged in and delivered to the site. <br /> G. The vents on the slopes were welded by GSE. <br /> H. Geocomposite has been placed on the eastern slopes. <br /> 3. Projected schedule: <br /> A. The leachate tank should be delivered by this Thursday. <br /> B. Guinn provided copies of the project schedule. <br /> C. GSE should be complete by next Monday. <br /> D. Guinn should be able to grade and complete the impoundment within two <br /> weeks. <br /> E. Butch will coordinate with Environmental Health so that they will be here for <br /> the well abandonment. <br /> F. Guinn can begin excavating the impoundment. <br /> G. Vector will conduct the CQA on the well abandonment and prepare the final <br /> report. <br /> 4. Coordination of schedules: <br /> A. GSE will remobilize to Forward after the pond is excavated and final grading <br /> is complete. <br /> B. Vector will have Precision conduct the conformance testing on the smooth <br /> HDPE for the pond. <br /> C. GSE has one more roll to deliver for the smooth HDPE. They will try to get it <br /> out of the same batch so an additional conformance test does not need to be <br /> conducted. <br /> D. After the pond is complete, how is leachate going to be delivered to the pond? <br /> Should the leachate line be extended and what is the alignment? Scott will <br /> contact Sangeeta and Pete, Mike, or Kurt Fujii to get a determination. Guinn <br /> can do the installation. <br /> E. GSE should complete the geocomposite by tomorrow so that Guinn can <br /> backfill the anchor trench on the Eastern slopes. <br /> n:/986011.01/Weekly Progress Meetings/07-13-99 Meeting 5.doc Page 2 <br />