Laserfiche WebLink
and placing the geotextile per plan. Duane will let Ben know when the work <br /> will occur so that he can observe it. <br /> F. Below the fence below the road on the south side of the ash pit, there is a lot <br /> of loose soils. Duane will contact Tim to determine how they will take care of <br /> that slope. <br /> 6. Problems which impede the construction schedule and corrective measures: <br /> A. The roots in the slopes of the impoundment need to be dealt with. A solution <br /> will be determined at the end of this meeting. <br /> 7. Review submittal schedules: <br /> A. We need to get the manufacturer's certifications for the additional rolls of <br /> geotextile and geomembrane. <br /> 8. Review of off-site manufacturing and delivery schedules: <br /> A. The additional material from GSE will be here by tomorrow. <br /> B. Scott will check with Sangeeta about archiving samples of geotextile and not <br /> running conformance tests on them. <br /> 9. Access issues: <br /> None <br /> 10. Health and safety issues: <br /> A. Duane provided safety meeting minutes to Butch. <br /> 11. Other items: <br /> A. A site meeting was held on August 4"' with Tim, Butch, Duane, Scott, and Ben <br /> to discuss the roots in the subgrade of the impoundment and other issues. <br /> The results of that meeting included the following items. <br /> B. Changing the air vents on the impoundments. Sangeeta will check with <br /> CH2Mhill for a detail or Vector can provide one. <br /> C. Deleting the tire ballast and replacing it with a 14-inch layer of on-site soils <br /> over the bottom of the impoundment. Guinn will do this work at no additional <br /> cost. They will also install escape ropes around the pond. <br /> D. Overexcavating a portion of the side slopes to remove roots. The remaining <br /> slopes that have occasional roots will be dug out by hand and soil compacted <br /> back by hand. <br /> n:/986011.01/Weekly Progress Meetings/08-03-99 Meeting 7.doc Page 3 <br />