Laserfiche WebLink
PRECONSTRUCTION MEETING NOTES <br /> TO: Pete Keller/Allied Waste Kevin Basso/Forward, Inc. <br /> Butch Stefan/Forward, Inc. Ben Dell-Era/Vector <br /> Tim Guinn/Guinn Scott Purdy/Vector <br /> Jeff Affonso/Guinn Dale Geary/GSE <br /> COPIES: Duane Meadows/Guinn <br /> FROM: Sangeeta Lewis/Lewis Engineering <br /> DATE: May 7, 1999 <br /> SUBJECT: Forward Landfill 1999 Construction; Preconstruction Meeting Notes <br /> The preconstruction meeting was held on May 4, 1999 at 10:30 am at the Forward, Inc. <br /> Landfill site office. The attendees and their contact information are summarized in the <br /> following table. <br /> PERSON FIRM TELEPHONE FAX <br /> Kevin Basso Forward, Inc. 209.466.4482 209.465.0631 <br /> Butch Stefani Forward, Inc. 209.982.4298 209.982.1009 <br /> Mike Caprio Allied Waste - - <br /> Pete Keller Allied Waste 602.596.9596 602.970.4685 <br /> Scott Purdy Vector 530.272.2448 530.272.8533 <br /> Ben Dell-Era Vector 530.272.248 530.272.8533 <br /> Sangeeta Lewis Lewis Engineering 510.601.7223 510.601.7206 <br /> Tim Guinn Guinn Construction 661.325.6109 661.325.5173 <br /> Jeff Affonso Guinn Construction 661.325.6109 661.325.5173 <br /> Jeff Gutierrez DeWalt Corp. 661.323.4600 661.323.4674 <br /> Dale Geary GSE Lining 281.230.2595 281.230.8623 <br />