My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEETING NOTES <br /> Page 2 <br /> May 7, 1999 <br /> INTRODUCTION <br /> • Scott will be the construction manger for the project and will coordinate with Pete. <br /> Sangeeta will provide engineering support to Scott. Vector will provide CQA <br /> services. <br /> • Duane Meadows will be project manger for Guinn with support from Tim. <br /> DeWalt will provide the surveying. <br /> • GSE will be the geosynthetics contractor. <br /> PROJECT OVERVIEW <br /> Sangeeta mentioned that the WMU D-99 design is still being reviewed by the regulators and <br /> hasn't been approved. Approval has been received on the base of WMU D-99, which was <br /> originally part of WMU D-98. Regulatory approval of all of WMU D-99 should be received <br /> in the next couple of weeks. Guinn can start working on the base of WMU D-99, but lining <br /> of the Eastern Ash Pit and WMU D-88 slopes will have to wait until regulatory approval is <br /> received. <br /> Revised fullsize and half size drawings were distributed. <br /> • Excavation—Sangeeta noted that approximately 50,000 cy of excavation was <br /> required. In the past, the excavated material was used for the subgrade fill. This <br /> time, however, Forward is placing subgrade fill so Guinn will need to place <br /> excavated material in the stockpile to the west of WMU D-99. Guinn said this was <br /> ok. <br /> • Clay Liner—The specifications for the clay liner admix are the same as in the past. <br /> Guinn will use same mixing pad area as last year. <br /> • Subgrade Fill—Forward is currently placing the subgrade fill. The subgrade fill on <br /> the Eastern Ash Pit will be completed by May 5. The waste and subgrade fill in <br /> the WMU D-88 area should be completed next week. The specification <br /> requirements for the subgrade fill are 90 percent compaction. Vector will perform <br /> compaction and nuclear density tests on the subgrade fill. The subgrade fill on the <br /> Eastern Ash Pit slopes needs to be approximately 1-2 ft thick. The subgrade fill on <br /> the WMU D-88 slopes needs to be a total of 5-ft thick on the 4:1 slopes and 4-ft <br /> thick on the 2:1 slopes. Forward will pothole the existing WMU D-88 slopes to <br /> see how much interim cover soil currently exists on the slopes. Vector will <br /> pothole after Forward is done with subgrade fill placement on WMU D-88 to <br /> verify that an adequate thickness has been placed. <br /> Sangeeta requested that DeWalt survey the Ash Pit and WMU D-88 area after <br /> Forward is completed with subgrade fill placement. Jeff Affonso said that since <br />
The URL can be used to link to this page
Your browser does not support the video tag.