Laserfiche WebLink
05/10/99 Construction Field Report Job No. 986011.0', <br /> DFR No. 1 VECTOR ENGINEERING, INC. page No. 1 <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 1 <br /> Location Of Work: Owner's Or Cheat's Representative: Date: Day Of Week: <br /> MantecaICA Butch Stefan,Jr. 5-10-99 Monda <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purl <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> On site!Lnk clay Clear Warm FRANK DELL-ERA <br /> Equipment used: <br /> Guittn:140G Grader 2-633 Paddle Wheels.Allied:2-300E Cat Rock Trucks Excavator Grader Water Truck <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Construction is not on site today. <br /> Allied Waste is working on subgrade preparation in the ash pit area and the eastern slope of cell D-99. Allied <br /> had 2 rock trucks hauling material from the stockpile area to the west of the cell to the eastern slope where <br /> they had a D4 and D8 spread the material. Allied utilized a smooth drum compactor to roll the northern ash <br /> pit slope and the D8 track walked the eastern slope of the D-99 cell. Allied utilized a water truck to maintain <br /> moisture in the subgrade material. <br /> Vector Engineering, Inc. tested compaction on the subgrade material placed with all tests passing the <br /> required specifications. CQA pulled a bulk bucket sample for a proctor. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: <br />