05/11/99 Construction Field Report Job No. 986011.0: <br /> DFR No. 2 VECTOR ENGINEERING, INC. Page No <br /> Project Name: Client Or Owner: Daily Field ReportSequenc7eNto-- <br /> Forward Landfill Allied Waste 2 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stefan/,Jr. 5-11-99 Tuesday <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By. <br /> Guinn Construction GSE Scott Purd <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician <br /> On site sandy clay_ Clear WarmFRANK DELL-ERA <br /> Equipment used: <br /> Guinn:14OG Grader 2-633 Paddle Wheels.Allied:2-300E Cat Rock Trucks 325 Cat Excavator <br /> 2824 140G Grader. <br /> NOTES(Descn'be work completed during the day,any problems and their solutions): <br /> Guinn Crew: 2 total <br /> Dewalt Crew: 2 total <br /> Allied Crew: 7 total <br /> Tim Guinn and Duane Meadows of Guinn Construction are on site today with their surveyors from Dewalt <br /> Surveying. Dewalt set control points for full coverage of the site. Dewalt shot the topo on the WMU F-99 <br /> North Class H Leachate pond Dewalt did not complete the topo due to the depth would not allow them to <br /> shoot the bottom with out setting up at a different point. Dewalt shot a topo of the liner tie-in 50' to each <br /> side. During setup it was found that point#103 was.5 low per the print out from allied. <br /> Allied Waste is working on subgrade preparation in the eastern slope of cell D-99. Allied had 2 rock trucks <br /> hauling material from the stockpile area to the west of the cell to the eastern slope where they had a D4 and <br /> D8 spread the material. Allied utilized the D8 to track walk the eastern slope of the D-99 cell for <br /> compaction. <br /> Vector Engineering, Inc. performed density tests on the subgrade material with failing results. CQA notified <br /> Allieds representative. Allied then reworked and compacted the area in question. CQA retested with all tests <br /> passing required specifications. CQA observed surveying. <br /> File Name:Forward Landfill Prepared by: Frank Dell-Era Reviewed by: <br />