Laserfiche WebLink
05/13/99 Construction Field Report Job No. 986011.0,' <br /> DFR No.4 VECTOR ENGINEERING, INC. Page No. 1 <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 4 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch StefimiJr. 5-13-99 Thursday <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purd <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> On site sandy clay Clear Warm FRANK DELL-ERA <br /> Equipment used: <br /> Guinn:14OG Grader,2-633 Paddle Wheels,D6R Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck.Allied:2-300E <br /> Cat Rock Trucks 325 Cat Excavator D8,D4 140G Grader Smooth Drum Roller. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 7 total <br /> Allied Crew: 2 total <br /> Dewalt Crew: 2 total <br /> Guinn's water Truck arrived on site today. Guinn has the water truck performing dust control all over the <br /> site. Guinn Construction had 3 laborers and an excavator exposing the liner and pipe tie in located at the toe <br /> of the eastern slope. Guinn is exposing the liner tie in and drainage aggregate on the southern edge of cell <br /> WMU D-98. The D6R Cat ripped the toe of the slope on the eastern end of the cell floor where there was <br /> about a 7' cut to the hinge point per the surveyors staking and established a haul road. Guinn started prep <br /> work on the stockpile and mixing pad areas utilizing the grader and the 633 paddle wheel scraper. Guinn cut <br /> material from last years clay mixing pad area and placed the material on the area to be utilized for this years <br /> mixing pad to level the area. Guinn grubbed the clay stockpile area. Guinn set up the laser to get controls on <br /> the mixing pad. Dewalt set cuttfill stakes on the northern end of the cell area. <br /> Allied has the D4 trimming and the smooth drum roller compacting the eastern slope above cell WMU-99 <br /> and the ash pit. <br /> Vector Engineering, Inc. observed clearing and grubbing of the stockpile areas,compaction of eastern slope, <br /> excavation of the liner edge and LCRS pipe. <br /> File Name: Forward Landfill Pr aced by: Frank Dell-Era Reviewed by: U S <br />