Laserfiche WebLink
05/14/99 Construction Field Report Job No.986011.0; <br /> DFR No. 5 VECTOR ENGINEERING, INC. Page No. 1 <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.. <br /> Forward Landfill Allied Waste 5 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stefan,Jr. 5-14-99 Tri ay <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> On site sandy ela Clear Warm FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 140G Grader,2-633/1-623 Paddle Wheels,D6R Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck. Allied:2- <br /> 300E Cat Rock Tnac 325 Cat Excavator,D8 D4 14OG Grader, Smooth Drum Roller. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 7 total <br /> Allied Crew: 6 total <br /> Dewalt Crew:Not on site <br /> Guinn had a 623 Cat Paddle wheel arrive on site today. Guinn Construction continued to have 2 laborers <br /> and an excavator exposing the liner tie in on the south side of cell WMU D-98. Guinn continued to work on <br /> preparing the mixing pad for the clay and on site mixture stockpile. Guinn utilized the 623 and 633 paddle <br /> wheels to remove the spoils from the cell floor. Guinn hauled the excavated material to the Allied stockpile <br /> northwest of the cell. The grader is working on leveling the low areas defined by laser checks in the mixing <br /> d area. Guinn is cutting the old haul roadway from off of cell floor and haulinge material to the <br /> stockpile area to the northwest of cell WMU D-99. <br /> Allied Waste is working on subgrade preparation on eastern slope of cell D-99. Allied had 2 rock trucks <br /> hauling material from the stockpile at WMU B to the eastern slope where the D4 and the D8 are spreading <br /> n. lied utilized the smooth <br /> for compaction. Al <br /> D Ozer is track o <br /> the material in thin even lifts The 8 d <br /> g Pa <br /> drum roller to compact the slope below the second bench on the eastern slope by backing it down the slope. <br /> CQA- Observed excavation of the liner tie in, Continued construction of the mixing pad area. CQA <br /> informed Allied that they needed to moisture condition the bottom lift prior to placing the subsequent lift of <br /> subgrade material. CQA explained to Guinn that a minimum of 2' for over lap of the torn geotextile at the <br /> cell WMU D-99 tie in was needed CQA asked Guinn for a construction schedule. CQA was told Guinn <br /> needs to print them out. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: Vl <br />