My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
05/19/99 Construction Field Report Job No. 986011.0: <br /> DFR No. 8 VECTOR ENGINEERING, INC. Page No. l <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 8 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stefan,Jr. 5-19-99 Wednesday <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> On site tan sandy clay, Tan white import Ione Clay Clear,Warm FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 140G Grader,2-633/1-623 Paddle Wheels,D6R Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck. Allied:2- <br /> 300E Cat Rock Trucks,325 Cat Excavator,D8,D4 140G Grader, Smooth Drum Roller. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 9 total <br /> Allied Crew: 6 total <br /> Tim Guinn was on site. Guinn Construction started the lone Clay import haul today. Guinn has the 966 <br /> loader spreading the clay as the trucks are dumping it on the clay stockpile area. Guinn imported <br /> approximately 1,800 tons of lone clay. Guinn is continuing to cut the cell floor down to grade. Guinn utilized <br /> 2-633/1-623 paddle wheels to excavate and haul the subgrade material to the stockpile area northwest of cell <br /> WMU D-99. Guinn is grading and moisture conditioning the material as it is being stockpiled. Guinn's grade <br /> checker is continuously checking grade on the cell floor of WMU D-99. Guinn started a second stockpile for <br /> the roadway waste material unsuitable for the clay mixture just north of the clean material stockpile. <br /> Allied Waste is working on the subgrade preparation along the liner edge on the eastern slope tie in of cell <br /> WMU D-98 and 99. Allied is utilizing 2 rock trucks to haul subgrade material from the WMU B cell. Allied <br /> has the water truck moisture conditioning the subgrade material prior to the placement of subsequent lifts. <br /> The subgrade material is being spread by the D4 and track walked with the D8 for compaction. <br /> Vector Engineering, Inc. Observed placement and compaction of the subgrade material. CQA performed <br /> density tests on the subgrade material with all tests passing the required specifications. Pulled 2 samples of <br /> imported clay for testing of moisture,pi and sieve analysis. CQA dried back a clay moisture sample in the <br /> microwave with a moisture content of 22.7%. CQA pulled clay 3 samples for oven moisture checks. CQA <br /> informed Guinn that some asphalt material from the old access roadway had made its way into the stockpile <br /> for the clay mix material and needed to be removed. Guinn said they would start another stockpile and keep <br /> a closer eye on the material. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: <br />
The URL can be used to link to this page
Your browser does not support the video tag.