My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06/11/99 Construction Field Report Job No. 986011.0: <br /> DFR No. 24 VECTOR ENGINEERING,, INC. Page No. <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 24 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Mantn CA Butch St Jr. 6-11-99 Friday <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> On site sand c1a Clear,Hot FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 14OG Grader,3-633/1-623 Paddle Wheels,DSH Cat Dozer,D6R Cat Dozer,320L Cat Excavator,966D Cat loader,Water <br /> Truck,S 1 SF Cat Sh foot Com or. Allied:2 Rock Trucks,D4 14OG Grader D8, Smooth Drum Roller,and Water Truck. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew:Not on site. Dewalt Crew: total 2 <br /> Allied Crew: 2 total <br /> Guinn had the surveyors on site setting off sets for the sump and cut/fill stakes on the southern road. Dewalt <br /> Resurveyed the topo of the cell for quantities of excavated materials. <br /> Allied is finish rolling the top of the subgrade material for GCL placement Allied continued to work on the <br /> cover material on the south slope of cell Wlb7[lU D-88. <br /> Vector Engineering, Inc. Observed surveying and rolling of subgrade material. CQA asked the surveyors to <br /> send a copy of the southern road design to Sangita for review. CQA informed Allied that the subgrade for the* <br /> cell floor had been approved for clay placement <br /> File Name: Forward Landfill Prepared by: Frank DeII-Era Reviewed by: VS <br />
The URL can be used to link to this page
Your browser does not support the video tag.