Laserfiche WebLink
06/11/99 Construction Field Report Job No. 986011.0: <br /> DFR No. 24 VECTOR ENGINEERING,, INC. Page No. <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 24 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Mantn CA Butch St Jr. 6-11-99 Friday <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> On site sand c1a Clear,Hot FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 14OG Grader,3-633/1-623 Paddle Wheels,DSH Cat Dozer,D6R Cat Dozer,320L Cat Excavator,966D Cat loader,Water <br /> Truck,S 1 SF Cat Sh foot Com or. Allied:2 Rock Trucks,D4 14OG Grader D8, Smooth Drum Roller,and Water Truck. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew:Not on site. Dewalt Crew: total 2 <br /> Allied Crew: 2 total <br /> Guinn had the surveyors on site setting off sets for the sump and cut/fill stakes on the southern road. Dewalt <br /> Resurveyed the topo of the cell for quantities of excavated materials. <br /> Allied is finish rolling the top of the subgrade material for GCL placement Allied continued to work on the <br /> cover material on the south slope of cell Wlb7[lU D-88. <br /> Vector Engineering, Inc. Observed surveying and rolling of subgrade material. CQA asked the surveyors to <br /> send a copy of the southern road design to Sangita for review. CQA informed Allied that the subgrade for the* <br /> cell floor had been approved for clay placement <br /> File Name: Forward Landfill Prepared by: Frank DeII-Era Reviewed by: VS <br />