Laserfiche WebLink
06/10/99 Construction Field Report Job No. 986011.0: <br /> DFR No. 23 VECTOR ENGINEERING, INC. Page No. 1 <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 23 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Mariteca,CA Butch Stefan,Jr. 6-10-99 Thursda <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purd <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: T Weather: CQA Technician: <br /> On site sand clay Clear Warm I FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D5H Cat Dozer,D6R Cat Dozer,320L Cat Excavator,966D Cat loader,Water <br /> IMcl 815F Cat SLmjfbot Com actor. Allied:2 Rock Trucks,D4 14OG Grader,D8 Smooth Drum Roller,and Water Truck- <br /> NOTES <br /> ruckNOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 8 total Dewalt Crew. total 2 <br /> Allied Crew: 2 total <br /> Guinn brought in a D5H Cat Dozer and the D6R Cat left the site. Guinn Construction utilized the grader and <br /> loader to grade the LCRS channels as the surveyors verified grade. Guinn utilized 1-633 paddle wheel to <br /> haul excavated material to the appropriate stockpiles. Guinn performed compaction on clean fill material <br /> placed 6-9-99 on the southern bench between Cell WMU D-99 and the Ashpit. Guinn continues to work on <br /> the southeastern drop structure utilizing the excavator and the D6R. Guinn proof rolled the subgrade material <br /> utilizing the 633 scraper. Dewalt is on site checking grade in the LCRS channels and sending information to <br /> their office on the southern roadway. <br /> Allied is placing subgrade material on the southeastern slope over the daily cover material. Allied is utilizing <br /> an excavator to load 2 rock trucks with material from WMU B stockpile. Allied is spreading the material <br /> with the D4. <br /> Vector Engineering,Inc. Observed grading and proof rolling of subgrade material on the cell floor. <br /> Performed compaction tests on the subgrade material with all tests meeting the required specifications. <br /> Received and sent to Vector Engineering subgrade information from Dewalt surveying. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: �S <br />