Laserfiche WebLink
06/17/99 Construction Field Report Job No. 986011.0: <br /> DM No. 28 VECTOR ENGINEERING, INC. Page No <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 28 <br /> Location Of Work: 's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch StdaniJr. 6-17-99 Tllursda <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician <br /> Tan White Clay/On site-dayey sand Clear Warm FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D5H Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck,CS 563C <br /> Cat Smooth Drum roller,815F Cat Shee foot Co ctor. Allied:Water Truck. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew. 8 total Tim Guinn on site. <br /> Allied Crew: I total <br /> Guinn received a smooyh drum roller today. Guinn continues to work on the final lift on the north and south <br /> ends of the cell floor utilizing the laser to achieve the 2%flow towards the LCRS channel. Guinn started to <br /> excavate the north to south LCRS channel today. Guinn continued to construct the roadway to the south of <br /> Ashpit. Guinn utilized 2-633 paddle wheel scrapers to haul subgrade material from the clayey earthfill <br /> stockpile to the south roadway. Guinn compacted the material in 6-8"loose lifts with the 815F Sheepfoot <br /> compactor. Prior to placement of the subgrade material Guinn scarified and moisture conditioned the <br /> existing subgrade. Guinn had a laborer hand raking the loose material from the eastern slope below bench <br /> #l. The laborer hand raked and shoveled loose material from under the liner edge tie in to cell WMU D-98. <br /> Allied utilized the water truck to maintain moisture in the subgrade material. <br /> Vector Engineering,Inc. CQA observed placement and tested the subgrade material placed on the southern <br /> roadway with all tests meeting the specified requirements. CQA informed Guinn to clean all staking material <br /> and debris from the cell area. Guinn said the surveyors are to be on site Tuesday the 22d instead of the 21". <br /> Guinn will have the water truck on site over the weekend maintaining moisture in the clay liner 3-4 times a <br /> day- <br /> 0 <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: �S <br />