My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06/21/99 Construction Field Report Job No. 986011.0: <br /> DFR No. 30 VECTOR ENGINEERING, INC. Page No. l <br /> Project Name: Client Or Owner: Daily Field Report S70f <br /> No.: <br /> Forward Landfill Allied Waste 30 <br /> Location Of Work: Owner's Or Client's Representative: Date: Dek: <br /> Manteca,CA Butch Stef ' Jr. 6-21-99 Monday <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> Tan White Clay Clear Warm FRANK DELI.-ERA <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D5H Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck,CS 563C <br /> Cat Smooth Drum roller,815F Cat Sh foot Com actor. Allied:Water Truck,Fork Lift.GSE: 544E John Deere Loader. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 7 total <br /> Allied Crew: 4 total <br /> Guinn continues to work on the final lift on the south end of the cell floor utilizing the laser to achieve the <br /> 2%flow towards the LCRS channel and 1%towards the sump area. Guinn continues to excavate the LCRS <br /> channel running east to West. Guinn started excavating the Western LCRS channel running north to south. <br /> Guinn completed excavation of the anchor trench the Ashpit's Southwest slope. Guinn continued to work on <br /> the southern roadway. <br /> Allied graded the lay down area for the liner and placed visquine down. Allied placed visquine cover over <br /> the geocomposite material. Allied unloaded 4 loads of material today. Allied utilized the forklift to unload <br /> the trucks. <br /> Vector Engineering, Inc. C A observed unloadin and to ed 4 truck loads of material. <br /> Material Delivered Total if Delivered Total fe Delivered to Date <br /> HDT 60 mil 105,300 105,300 <br /> HUE 60 mil <br /> HST 60 mil 283,500 283,500 <br /> Geonet <br /> Geotextile <br /> Geocom osite Single sided <br /> Geocomposite Double sided 84,000 84,000 <br /> GCL <br /> 0 <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: �S <br />
The URL can be used to link to this page
Your browser does not support the video tag.