My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
06/22/99 Construction Field Report Job No. 986011.0,' <br /> DFR No. 31 VECTOR ENGINEERING,, INC. Page No. 1 <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 31 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stefan,Jr. 6-22-99 Tues 4 <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purl <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician: <br /> Tan White Clay Clear Hot FRANK DELL-ERA <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,135H Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck,CS 563C <br /> Cat Smooth Drum roller, 815F Cat Shea foot Com actor: Allied:Water Truck,ForkLift. GSE: 544E John Deere Loader <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 5 total <br /> Allied Crew: 2 total <br /> Guinn continues to work on the final lift on the south end of the cell floor utilizing the laser to achieve the <br /> 2%flow towards the LCRS channel and the I%towards the sump area. Guinn continues to excavate the <br /> LCRS channels running north to south. Guinn excavated the sump area to precipitate GCL placement instead <br /> of 2' of clay. Guinn had a laborer hand raking the slopes below the first bench on the east and south of the <br /> cell floor. Guinn grader broke down at 12:00p.m. Guinn will complete the clay tomorrow a.m. Guinn has <br /> the water truck maintaining moisture in clay and dust control around the site. <br /> Allied unloaded 1 load of 861 geotextile from GSE. <br /> Vector Engineering,Inc. Attended weekly construction meeting with representatives of Guinn construction. <br /> CQA observed excavation of the sump, grading of the clay liner system and raking of the east and south side <br /> slopes. CQA observed unloading and logged 1 truck load of material. <br /> Material Delivered Total if Delivered Total tif Delivered to Date <br /> HDT 60 mil 105,300 <br /> HME 60 mil <br /> HST 60 mil 283,500 <br /> Geonet <br /> Geotextile 81,000 81,000 <br /> Geocom osite Single sided <br /> Geocom osite Double sided 84,000 <br /> GCL <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: US <br />
The URL can be used to link to this page
Your browser does not support the video tag.