My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
07/01/99 Construction Field Report Job No. 986011.0: <br /> DFR No. 38 VECTOR ENGINEERING, INC. Page No. 1 <br /> Project Name: Client Or Owner: Daily Field Report S70f <br /> No.: <br /> Forward Landfill Allied Waste 38 <br /> Location Of Work: Owner's Or Client's Representative: Date: Deek: <br /> Manteca,CA Butch StefaniJr. 7-01-99 Thursday <br /> General Contractor: Liner Contractor: Proi. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technicianfrechnician: <br /> Clear Hot FRANK DELL-ERA <br /> ANTONIO HENRI UEZ <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,D5H Cat Dozer,320L Cat Excavator,966D Cat loader,Water <br /> Truck,CS 563C Cat Smooth Drum Roller. Allied:Forklift. GSE: 544E John Deere Loader Gradall. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 5 total Tim Guinn GSE Crew: 12 total <br /> Guinn performed clean up and some detail work on the southern slope of cell WMU D-99. Guinn worked on <br /> grading the access ramp entering from the Northwest of cell WMU D-99. <br /> GSE deployed geomembrane on the cell floor from the tie in to cell WMU D-98 towards the south. A total of <br /> 20 panels were placed with approximately 99,753ft2 of geomembrane being deployed. All panels were <br /> seamed and airtested. GSE unloaded l load of GCL delivered to the site today. GSE had extrusion welders <br /> working on the tie in and wedge welders on the other seams. GSE performed several repairs on the destruct <br /> areas and panel air test points. <br /> Vector Engineering,Inc. Logged panel deployment of geomembrane,overlap, start-ups, seaming and <br /> airtesting. CQA pulled 5 destructs all with passing results. <br /> Observed unloading and logged in 3 loads of liner material. <br /> Material Delivered Total Delivered Total fe Delivered to Date <br /> HDT 60 mil 105,300 <br /> HUM 60 mil 169,200 <br /> HST 60 mil 378,000 <br /> Geonet 71,400 <br /> Geotextile 81,000 <br /> Geocomposite Single sided 210,000 <br /> Geocom osite Double sided 119,000 <br /> GCL 33,600 317,100 <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: <br />
The URL can be used to link to this page
Your browser does not support the video tag.