06/30/99 Construction Field Report Job No. 986011.0: <br /> DFR No. 37 VECTOR ENGINEERING, INC. Page No. 1 <br /> Project Name: Client Or Owner: Daily Field Report SequenceNo.: <br /> Forward Landfill Allied Waste 37 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch St Jr. 6-30-99 Wednesda <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician/Technician: <br /> Clear Hot FRANK DELL-ERA <br /> ANTONIO HENRIQUEZ <br /> Equipment used: <br /> Guinn: 14OG Grader,3-633/1-623 Paddle Wheels,D511 Cat Dozer,320L Cat Excavator,966D Cat loader,Water Truck,CS 563C <br /> Cat Smooth Drum Roller Ditch WitEl Vibratoa Plate. Allied:Water Truck,Forklift. GSE:544E John Deere Loader,Gradall. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 5 total GSE Crew: 12 total <br /> Guinn continues to have the water truck maintain moisture in the clay on the cell floor and performing dust <br /> control all over the site. Guinn utilized the compactor and a vibratory plate to compact the tie in below <br /> bench#1 on the eastern slope of cell WMU D-99. Guinn utilized a Ditch Witch to excavate the 3"trench on <br /> the southwestern slope of cell WMU D-99. (Per approval the trench will be 1' in width.). Guinn performed <br /> clean up around the cell and slopes by removing rocks and debris. Guinn started importing the coarse gravel <br /> today. <br /> GSE started deployment of the GCL on the eastern slope of cell V' 99 below bench#1. A total of 1 <br /> panels were placed with approximately 12,353.5ft2 being deployed. GSE placed 11 panels of geomembrane <br /> over the GCL totaling approximately 10950ft2 being deployed All panels were seamed and anchored. No <br /> airtests were performed due to the excessively high heat. GSE unloaded 3 loads of GCL delivered to the site <br /> today. <br /> Vector Engineering,Inc. Logged panel deployment of GCL and Liner,overlap, start-ups and seaming. <br /> Observed unloading and logged in 3 loads of liner material. <br /> Material Delivered Total fe Delivered Total fe Delivered to Date <br /> HDT 60 mil 105,300 <br /> HME 60 mil 169,200 <br /> HST 60 mil 378,000 <br /> Geonet 71,400 <br /> Geotextile 81,000 <br /> Geocom osite Single sided 210,000 <br /> Geocom osite Double sided 119,000 <br /> GCL 98,700 283,500 <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: �S <br />