07/06/99 Construction Field Report Job No. 986011.0: <br /> DFR No. 41 VECTOR ENGINEERING, INC. Page No. 1 <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 41 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stefani,Jr. 7-06-99 Tuesda <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician/Technician: <br /> Clear Warm FRANK DELL-ERA <br /> ANTONIO HENRIQUEZ <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,D5H Cat Dozer,320L Cat Excavator,966D Cat loader,Water <br /> Truck,CS 563C Cat Smooth Drum Roller. Allied:Forklift. GSE: 544E John Deere Loader Gradall. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 4 total GSE Crew: 15 total <br /> Guinn worked on welding the pipe for the LCRS system. Guinn welded the T and 214ft of pipe in the north <br /> and south V channel on the eastern end of the cell floor. Guinn has the water truck all over the site <br /> performing dust control. Guinn placed coarse gravel in a burrito wrap around the welded LCRS collection <br /> pipe in the western V channel on the southern end. <br /> GSE made repairs to the panels placed on the slope below the 2nd bench. GSE deployed geocomposite off of <br /> the 2nd bench down to the LCRS V on the cell floor eastern edge channel per plans. A total of 24 panels were <br /> deployed with approximately 35, 15.5ft2. All panels were tied but not sewn yet due to GSE does not have a <br /> sewing machine on site. GSE placed GCL and Geomembrane from the 3rd bench down to the 2nd bench. GSE <br /> deployed a total of 22 panels of GCL with approximately 24,352ft2. GSE deployed a total of 11 panels of <br /> geomembrane with approximately 23,798ft2 <br /> . <br /> Vector Engineering,Inc. CQA observed some repairs to be made too the geomembrane above the 2nd bench <br /> during a walk through with the GSE foreman. CQA observed and logged repairs made. Observed vacuum <br /> testing of repairs made. CQA pulled 2 destructs with all tests passing the required specifications. <br /> No material arrived on site. <br /> Material Delivered Total Delivered Total f0e Delivered to Date <br /> HDT 60 mil 105,300 <br /> HME 60 mil 169,200 <br /> HST 60 mil 378,000 <br /> Geonet 71,400 <br /> Geotextile 81,000 <br /> Geocom osite Single sided 210,000 <br /> Geocom osite Double sided 119,000 <br /> GCL 13177100 <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: <br />