My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_1999_1
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_1999_1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:20 PM
Creation date
7/3/2020 10:47:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
1999_1
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_1999_1.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
07%07/99 Construction Field Report Job No.986011.0: <br /> DFR No. 42 VECTOR ENGINEERING, INC. Page No. <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 42 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stefan,Jr. 7-07-99 Tuesday <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdue <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician/Technician: <br /> Clear Warm FRANK DELL-ERA <br /> ANTONIO HENRI UEZ <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,D5H Cat Dozer,320L Cat Excavator,966D Cat loader,Water <br /> Truck,CS 563C Cat Smooth Drum Roller. Allied:Forklift. GSE: 544E John Deere Loader,Gradall. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 4 total GSE Crew: 15 total <br /> Guinn placed plywood on the southwestern edge of the geomembrane. Guinn wrapped the plywood with <br /> geotextile(per plans). Guinn welded the pipe cross section onto the western end of the LCRS collection <br /> pipe. Guinn placed clay earthfill to construct a ramp for the rock trucks to dump their loads on the <br /> southwestern edge of cell WMU D-99. Guinn has the water truck moisture conditioning the eastern slope <br /> where some repair is needed. Guinn will repair the subgrade on the eastern slope <br /> GSE made repairs to the panels placed on the slope below the 3rd bench on the eastern slope of cell WMU D <br /> 99. GSE deployed GCL and geomembrane from the top deck down to the 3rd bench._GSE deployed a total of- <br /> e <br /> 36 panels of GCL with approximately 28,352f 2. GSE deployed a total of 15 panels of geomembrane with <br /> approximately 19987f12. <br /> Vector Engineering,Inc. CQA observed some repairs to be made too the geomembrane above the 3rd bench. <br /> CQA observed and logged repairs made. Observed vacuum testing of repairs made. CQA pulled 3 destructs <br /> with all tests passing the required specifications. <br /> 3 loads of GCL material arrived on site. <br /> Material Delivered Total fe Delivered Total tf2 Delivered to Date <br /> HDT 60 mil 105,300 <br /> HME 60 tail 169,200 <br /> HST 60 rail 378,000 <br /> Geonet 71,400 <br /> Geotextile 81,000 <br /> Geocom osite Single sided 210,000 <br /> Geocomposite Double sided 119,000 <br /> GCL 98,700 1415,800 <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: <br />
The URL can be used to link to this page
Your browser does not support the video tag.