07%07/99 Construction Field Report Job No.986011.0: <br /> DFR No. 42 VECTOR ENGINEERING, INC. Page No. <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 42 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stefan,Jr. 7-07-99 Tuesday <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdue <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician/Technician: <br /> Clear Warm FRANK DELL-ERA <br /> ANTONIO HENRI UEZ <br /> Equipment used: <br /> Guinn: 140G Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,D5H Cat Dozer,320L Cat Excavator,966D Cat loader,Water <br /> Truck,CS 563C Cat Smooth Drum Roller. Allied:Forklift. GSE: 544E John Deere Loader,Gradall. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 4 total GSE Crew: 15 total <br /> Guinn placed plywood on the southwestern edge of the geomembrane. Guinn wrapped the plywood with <br /> geotextile(per plans). Guinn welded the pipe cross section onto the western end of the LCRS collection <br /> pipe. Guinn placed clay earthfill to construct a ramp for the rock trucks to dump their loads on the <br /> southwestern edge of cell WMU D-99. Guinn has the water truck moisture conditioning the eastern slope <br /> where some repair is needed. Guinn will repair the subgrade on the eastern slope <br /> GSE made repairs to the panels placed on the slope below the 3rd bench on the eastern slope of cell WMU D <br /> 99. GSE deployed GCL and geomembrane from the top deck down to the 3rd bench._GSE deployed a total of- <br /> e <br /> 36 panels of GCL with approximately 28,352f 2. GSE deployed a total of 15 panels of geomembrane with <br /> approximately 19987f12. <br /> Vector Engineering,Inc. CQA observed some repairs to be made too the geomembrane above the 3rd bench. <br /> CQA observed and logged repairs made. Observed vacuum testing of repairs made. CQA pulled 3 destructs <br /> with all tests passing the required specifications. <br /> 3 loads of GCL material arrived on site. <br /> Material Delivered Total fe Delivered Total tf2 Delivered to Date <br /> HDT 60 mil 105,300 <br /> HME 60 tail 169,200 <br /> HST 60 rail 378,000 <br /> Geonet 71,400 <br /> Geotextile 81,000 <br /> Geocom osite Single sided 210,000 <br /> Geocomposite Double sided 119,000 <br /> GCL 98,700 1415,800 <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: <br />