07115199 Construction Field Report Job No. 986011.0: <br /> DFR No. 49 VECTOR ENGINEERING, INC. Page No. 1 <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 49 <br /> Location Of Work: ( Owner's Or Client's Representative: Date: Day __Of Week: <br /> Manteca,CA Butch Stef * Jr. 7-15-99 Thursda <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows <br /> Source And Description Of Fill Material: Weather: CQA Technician/Technician: <br /> Clear Hot FRANK DELL-ERA <br /> ANTONIO HENRI UEZ <br /> Equipment used: <br /> Guinn: 14OG Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,D5H Cat Dozer,320L Cat Excavator,966D Cat loader,Water <br /> Truck,CS 563C Cat Smooth Drum Roller. GSE: 544E John Deere Loader,Gradall. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: 7 total GSE Crew: 16 total <br /> Guinn: The tank for the sump arrived on site. Guinn continued to import and grade the GDM utilizing the <br /> 134H and the D5M. Guinn continues to place geotextile and operation layer material over the approved <br /> GDM. Guinn utilized the grader to partially backfill the eastern slope anchor trench. Guinn had the water <br /> truck moisture condition the operations material at the stockpile and the material placed in the anchor trench <br /> prior to placement. Guinn moisture conditioned and compacted the northwestern slope of the Ashpit and the <br /> southeastern corner of the cell used by GSE for access. <br /> GSE deployed GCL and geomembrane on the eastern slope of the Ashpit and between the Ash it and the <br /> eastern slope of cell WMU D-99. GSE deployed 13 panels of GCL with approximately 9,767ft and 6 panels <br /> of HST geomembrane with a total of 8,624ft2. <br /> Vector Engineering,Inc. CQA observed placement of GDM, geotextile and the operations layer material. <br /> CQA observed GCL and geomembrane deployment,repairs, seaming,overlap and air testing made to the <br /> geomembrane. Observed vacuum testing of repairs made. CQA pulled 3 destructive samples with all <br /> meeting the required specifications. Observed backfilling of the anchor trench. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: <br />