Laserfiche WebLink
07/14/99 Constructi®n Field Repoli Job No.986011.0,' <br /> DFR No.48 VECTOR ENGINEERING, INC. Page No. 1 <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 48 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Mam CA Butch Stefiuu,Jr. 7-14-99 Wednesda <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purdy _ <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows William Geary <br /> Source And Description Of Fill Material: Weather: CQA Technician/Technician: <br /> Clear Hot FRANK DELL-ERA <br /> ANTONIO HENRI UEz <br /> Equipment used: <br /> Guinn: 14OG Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,D5H Cat Dozer,320L Cat Excavator,966D Cat loader,Water <br /> Truck,CS 563C Cat Smooth Drum Roller. GSE: 544E John Deere Loader,Gradall. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew. 4 total GSE Crew: 16 total <br /> Guinn continued to import and grade GDM pea Gravel on the northern end of the cell floor. Guinn <br /> completed grading the GDM placed on the southern middle portion of the cell floor. Guinn utilized the D4H <br /> to grade the GDM. Guinn has a laborer watching for wrinkles in the geomembrane as the D4 spreads the <br /> GDM material. The D5M Cat Dozer is spreading operations material north of the sump from the west <br /> towards the east and on the southern portion of the cell floor. Guinn is utilizing a 623 paddle wheel to haul <br /> the operations material down to the cell floor. The operations material is being placed at a 1' minimum <br /> thickness to 2' thick where the trucks and 623 run. Guinn has a water truck on site moisture conditioning the <br /> operations terial at the stockpile area. <br /> GSE deployed GCL and geomembrane on the top of the Ashpit and on the eastern slope of the Ashpit. GSE <br /> deployed 23 panels of GCL with approximately 25,34482 and 5 panels of HDT geomembrane on the top of <br /> the Ashpit with a total of 10,672ft. GSE deployed 10 panels of HST geomembrane on the eastern slope of <br /> the Ashpit with approximately 16,42882. <br /> Vector Engineering,Inc. CQA observed placement of GDM,geotextile and the operations layer material. <br /> CQA observed GCL and geomembrane deployment,repairs, seaming,overlap and air testing made to the <br /> geomembrane. Observed vacuum testing of repairs made. CQA pulled 2 destructive samples with passing <br /> results. CQA marked repairs on the geocomposite. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: �� <br />