Laserfiche WebLink
07/17/99 Construction Field Report Job No.986011.0,' <br /> DFR No. 51 VECTOR ENGINEERING, INC. Page No. <br /> Project Name: Client Or Owner: Daily Field Report Sequence No.: <br /> Forward Landfill Allied Waste 51 <br /> Location Of Work: Owner's Or Client's Representative: Date: Day Of Week: <br /> Manteca,CA Butch Stefan,Jr. 7-17-99 Saturday <br /> General Contractor: Liner Contractor: Proj. Engineer: Reviewed By: <br /> Guinn Construction GSE Scott Purd <br /> General Forman Liner Contractor Superintendent Or Foreman: <br /> Duane Meadows William Geary <br /> Source And Description Of Fill Material: Weather: CQA Technchiraechncim: <br /> Clear Hot FRANK DELL-ERA <br /> ANTONIO HENRI UEZ <br /> Equipment used: <br /> Guinn: 14OG Grader,3-633/1-623 Paddle Wheels,D4H Cat Dozer,D5H Cat Dozer,320L Cat Excavator,966D Cat loader,Water <br /> Truck,CS 5630 Cat Smooth Drum Roller.GSE: 544E John Deere Loader,Gradall. <br /> NOTES(Describe work completed during the day,any problems and their solutions): <br /> Guinn Crew: Not on site GSE Crew: 13 total <br /> GSE deployed GCL and geomembrane between the Ashpit and the eastern slope of cell WMU D-99. GSE <br /> deployed 16 panels of GCL with approximately 3,38282 and 6 panels of HST geomembrane with a total of <br /> 4,404ft2. <br /> Vector Engineering,Inc. CQA observed placement of GDM,geotextile and the operations layer material. <br /> CQA observed GCL and geomembrane deployment, repairs,seaming,overlap and air testing made to the <br /> geomembrane. Observed vacuum testing of repairs made.CQA pulled 1 destructive sample with all meeting <br /> the required specifications. <br /> File Name: Forward Landfill Prepared by: Frank Dell-Era Reviewed by: v� <br />