Laserfiche WebLink
remaining refuse capacity at the site as of January 2000 is estimated to be <br /> approximately 48,064,900 cy (based on a refuse to soil volume ratio of 6:1 and a <br /> refuse density of 1,740 pounds per cy). The site capacity calculations reflecting <br /> this information are included in Appendix C. <br /> 4.6 SITE LIFE PROJECTION <br /> 4.6.1 SITE LIFE CALCULATIONS <br /> In order to calculate the site life for the Forward Landfill, the fotlowing criteria <br /> was utilized. <br /> • Remaining Site Capacity (with liner,daily, <br /> intermediate and final cover) 51 mcy <br /> • Refuse to Cover Ratio 6:1 <br /> • In-Place Density 1,740 Ibs/cy <br /> Based on the above criteria and utilizing a starting inflow rate-of 4 400 tpd-wvith a <br /> 1.5 % annual growth rate and a maximum daily permitted refuse inflow rate of <br /> 7,880 tpd, the Forward Landfill will have a projected site life of 19 years. Based <br /> on these calculations .(see Table 8) operations at the Forward Landfill could <br /> extend to June 2020 <br /> 4.6.2 FACTORS AFFECTING SITE CAPACITY <br /> Many factors can affect the ultimate site capacity of a given landfill including <br /> variations in waste type, compaction rates; the use of alternative daily covers and <br /> the annual tonnage delivered to the landfill. The actual daily tonnage at the <br /> Forward Landfill depends greatly on the economy. Since a good majority of the <br /> waste accepted at the Forward Landfill will be construction/demolition type <br /> wastes, the inflow will be dependent on how much of that type of work is <br /> occurring in the area. The tonnage will also vary as the contracts with clients <br /> fluctuate and specialty markets change. Therefore, there may be times when the <br /> Forward Landfill will be accepting the maximum permitted tonnage of 7,880 tpd <br /> and others where it will fall way below. Table 8 is presented to provide a rough <br /> estimation of the inflow to the Forward Landfill for permitting purposes. <br /> 40 <br /> Forward Landfill JTD 4-10 <br /> L\Allied\2000.193\Reports\finalj td:S ec-4.0.doc:08/20/01 <br /> BRYAN A.STIRRAT&ASSOCIATES <br />