Laserfiche WebLink
FINAL DRAFT <br /> JOINT TECHNICAL DOCUMENT <br /> FORTHE <br /> FORWARD LANDFILL <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 5.2.2.2 Slope Liner System 5-3 <br /> 5.2.2.3 Interim Final Cover 5-3 <br /> 5.2.2.4 Intermediate Liter System 5-4 <br /> 5.2.3 Final Grading 5-4 <br /> 5.2.4 Final Cover 5-5 <br /> 5.2.4.1 Regulatory''Design"Stan arils 5.5 <br /> 5.2.4.2 Proposed Final Cover Design 5-7 <br /> 5.2.4.3 Soil Availability 5-8 <br /> 5.2.5 Fill Phasing 5-8 <br /> 5.2.6 Drainage 5-9 <br /> 5.2.6.1 On-Site Drainage Control 5-9 <br /> 5.2.6.2 Realignment of Littlejohns,Creek .544 <br /> 5.2.7 Landfill Gas Management. 5-11 <br /> 5.3 Design Calculations 5-13 <br /> 5.3.1 Soil Balance 5-13 <br /> 5.3.2 Static and Seismic Stability 5-13 <br /> 5.3.2.1 Seismicity 5-1°4 <br /> 5.3.2.2 Gross Stability Analyses 5-14 <br /> 5.3.2.3 Gross Stability Results 5-15 <br /> 5.3.3 Final Cover Slope Stability 54& <br /> 5.3.3.1 Analytical Methods 5-16 <br /> 5.3.3.2 Final Cover Results 5-16 <br /> 5.3.4 Settlement Analyses 5-17 <br /> 5.3.4.1 Previous Analyses 5-17 <br /> 5.3.4.2 Subgrade Consolidation 5-18 <br /> 5.3.4.3 Settlement of New Wastes 5-18 <br /> 5.3.4.4 Settlement of Existing Refuse 5-19 <br /> 5.3.4.5 Void Settlement and Potential Liner Distress 5-19 <br /> 5.3.4.6 Implications to Liner and Cover Design 5-20 <br /> 5.3.5 Leachate Generation 5-20 <br /> Forward Landfill jTD III <br /> L:\Allied\2000.193\Reports\finaljtd:TOC:08/22/01 BRYAN A.STIRRAT&ASSOCIATES <br />