Laserfiche WebLink
FINAL DRAFT <br /> JOINT TECHNICAL DOCUMENT <br /> FORTHE <br /> FORWARD LANDFILL <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 5.3.6 Surface Water Control 5-24 <br /> 5.3.7 Landfill Gas Generation and Air Emissions Calculations 5-25 <br /> 5.4 Construction Quality Assurance 5-26 <br /> 5.4.1 Introduction and Purpose 5-26 <br /> 5.4.2 Responsibility and Authority 5-27 <br /> 5.4.3 Personnel Qualifications "5=27 <br /> 5.4.3.1 CQA Manager 5-28 <br /> 5.4.3.2 CQA Inspection Personnel 5-28 <br /> 5.4.4 Inspection Activities 5-28 <br /> 5.4.4.1 Pre-Construction 5-28 <br /> 5.4.4.2 Construction 5-28 <br /> 5.4.4.3 Post-Construction Final Dowmentation 5:31 <br /> 6.0 DISPOSAL SITE OPERATIONS 6-1 <br /> 6.1 Hours 6-1 <br /> 6.2 Personnel 6-1 <br /> 6.2.1 Training 6-2 <br /> 6.2.2 Management Structure 6-3 <br /> 6.2.3 Emergency Contact List 6-4 <br /> 6.3 Equipment 6-5 <br /> 6.3.1 Minimum Equipment Requirements 6-5 <br /> 6.3.2 Standby Equipment 6-5 <br /> 6.3.3 Equipment Preventative Maintenance 6=5 <br /> 6.4 Material Handling Activities 6-6 <br /> 6.4.1 Construction Phasing 6-6 <br /> 6.4.2 Unloading 6-6 <br /> 6.4.3 Spreading and Compaction 6-6 <br /> 6.4.4 Daily Cover 6-7 <br /> 6.4.5 Intermediate Cover 6-7 <br /> 6.4.6 Alternative Daily Covers 6-7 <br /> Forward Landfill JTD iv <br /> L:\Allied\2000.193\Reports\finaljtd:TOC:08/22/01 BRYAN A.STIRRAT&.ASSOCIATES <br />