My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:23 PM
Creation date
7/3/2020 10:48:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2001
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Phases 3 through 7 will be constructed (from west to east) to the south of and <br /> over the existing Austin Road Landfill within an existing borrow area. The <br /> existing scalehouse facilities will be relocated easterly near the existing site <br /> offices during fill sequencing for Phase 7. The future scales/scalehouse facilities <br /> will serve Phase 8 located in the northeast corner of the site and Phase 9'which <br /> will close the gap between the two existing landfill prisms. Phase 9 fill <br /> sequencing will proceed from west to east over Phases and 2. Phase 10 <br /> located at the south side of the South Branch will be the final fill sequence <br /> 5.2.6 DRAINAGE <br /> Surface water control includesprotectionof the landfill from surface water run-on <br /> and flood influence by Little Johns Creek as well as proper handlingofiudace <br /> water runoff from the landfill areas. <br /> The surface drainage plan for the Forward Landfill is shown on Drawing 9 and <br /> drainage details are shown on Drawing 7. The drainage control facilities include a <br /> network of top deck diversion° sand inlets;°-dawn drains, perimeter-channels <br /> and beach drains for managing surface water runoff. A brief description of the <br /> drainage facilities are discussed in the following sections. <br /> 5.2.6.1 ON-SITE DRAINAGE CONTROL <br /> Permanent storm water runoff and drainage control facilities on site were designed <br /> to carry the peak discharge resulting from a 1,000-year; 24-hour storm event, as <br /> required by 27 CCR, Section 20320 for a Class 11 waste management:unit. A <br /> discussion of the design calculations is presented in Section 5.3.5. The drainage <br /> network for the completed landfill is designed to carry storm water,at,velocities <br /> that will control run-off and minimize erosion. <br /> The Forward Landfill surface water control plan consists of an integrated system of <br /> bench ditches, perimeter channels, top deck perimeter berms, and storm water <br /> sedimentation basins (shown on Drawings 7 and 9). The final landfill grades are <br /> designed so that surface water will run off the landfill via sheet flow until <br /> intercepted by a deck berm or bench ditch. The bench ditches subsequently drain <br /> toward trapezoidal AC down drains or corrugated steel pipes which discharge to <br /> perimeter channels. Finally, the perimeter channels drain to a stormwater <br /> sedimentation basin. <br /> Forward Landfill JTD 5-9 <br /> L:\AII ied\2000.193\Reports\fiinaljtd:Sec-5.0:08/2 2/01 <br /> c�ovnN A QTO�AT n efc4f7c1ATEf <br />
The URL can be used to link to this page
Your browser does not support the video tag.