My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2001
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:23 PM
Creation date
7/3/2020 10:48:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2001
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2001.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.4.2 RESPONSIBILITY AND AUTHORITY <br /> A registered civil engineer or certified engineering geologist designated as the <br /> CQA Manager will be in charge of observing the installation of the work, <br /> evaluating the materials for conformance with the plans and specifications, and <br /> all testing completed for the project during and after construction. Specifically, <br /> the CQA Manager will: <br /> • Review design plans and specifications for accuracy and completeness. <br /> • Prepare a schedule of.CQA inspection activities and coordinate necessary <br /> CQA personnel to conduct inspections. <br /> • Review and interpret data and reports prepared by CQA inspection <br /> personnel. <br /> The CQA inspection personnel will performvarious tests and observations <br /> during construction activities such as: <br /> • Verify that testing equipment is propedy..calibrated_on a regular basis.and <br /> document the calibration. <br /> • Accurately record test data and organ'rzeItin aumacnner that allows-easy <br /> reference. <br /> • Evaluate the contractor's construction quality control plans to ensure that <br /> they meet or exceed the facility CQA Plan requirements. <br /> • Report observations and test results as the work progresses. <br /> The CQA inspection personnel will work under the supervision and guidance of <br /> the CQA Manager who will be responsible for verifying that all tests are <br /> conducted in accordance with American Society for Testing and Materials <br /> (ASTM) standards or other specified test methods, and that the proper test <br /> equipment is used. The results of all inspections, including work that is <br /> unacceptable, will be reported to the CQA Manager. <br /> 5.4.3 PERSONNEL QUALIFICATIONS <br /> The CQA team will consist of a CQA Manager and inspectors whose <br /> qualifications will be as follows: <br /> Forward Landfill jTD 5-27 <br /> L:\AII ied\2000.193\Reports\finaljtd:Sec-5.0:08/22/01 <br /> BRYAN A-STIRRAT S ASSOCIATES <br />
The URL can be used to link to this page
Your browser does not support the video tag.