Laserfiche WebLink
San Joaquin Malley D <br /> Air Pollution Control District <br /> PERMIT UNIT: N-339-17-7 EXPIRATION DATE: 07/31/2006 <br /> EQUIPMENT DESCRIPTION: <br /> 13.8 MILLION CUBIC YARDS CAPACITY(218 ACRES)WITH LANDFILL GAS COLLECTION SYSTEM CONTROLLED <br /> BY A 48 MMBTU/HR ENCLOSED FLARE <br /> PERMIT UNIT REQUIREMENTS <br /> 1. This Authority to Construct serves as a written certificate of conformity with the procedural requirements of 40 CFR <br /> 70.7 and 70.8 and with the compliance requirements of 40 CFR 70.6(c). [District NSR Rule] Federally Enforceable <br /> Through Title V Permit <br /> 2. Prior to operating with modifications authorized by this Authority to Construct, the facility shall submit an application <br /> to modify the Title V permit with an administrative amendment in accordance with District Rule 2520 Section 5.3.4. <br /> [District Rule 2520,5.3.4]Federally Enforceable Through Title V Permit <br /> 3. Authority to Construct(ATC)permit N-339-17-6 shall be implemented prior to or simultaneously with ATC permit N- <br /> 339-17-7. [District NSR Rule] Federally Enforceable Through Title V Permit <br /> 4. Permit to Operate N-3057-3 shall be deleted upon implementation of ATC permit N-339-17-7. [District NSR Rule] <br /> Federally Enforceable Through Title V Permit <br /> All equipment shall be constructed,maintained and operated according to the specifications and plans contained in the <br /> permit application except as otherwise specified herein. [District NSR Rule] Federally Enforceable Through Title V <br /> Permit <br /> 6. All landfill gas collected shall be controlled by the flare. [District NSR Rule] Federally Enforceable Through Title V <br /> Permit <br /> 7. VOC (NMOC)emissions from the landfill shall not exceed 302.0 lb per day(50 Mg/year). [District NSR Rule] <br /> Federally Enforceable Through Title V Permit <br /> 8. The VOC destruction efficiency for the flare shall be at least 98%by weight. [District NSR Rule] Federally <br /> Enforceable Through Title V Permit <br /> 9. The flare shall maintain a temperature of at least 1,400 degrees F during operation. [District NSR Rule]Federally <br /> Enforceable Through Title V Permit <br /> 10. The landfill gas consumption rate for the flare shall not exceed 48.0 MMBtu per hour. [District NSR Rule]Federally <br /> Enforceable Through Title V Permit <br /> 11. Landfill gas consumption rate for the flare shall not exceed 804 MMSCF per year. [District NSR Rule] Federally <br /> Enforceable Through Title V Permit <br /> 12. Emissions from the flare shall not exceed any of the following emission limits: 0.05 lb NOx/MMbtu,0.0215 lb <br /> SOx/MMbtu,0.2 lb CO/MMbtu,0.0113 lb VOC/MMbtu(20 ppmv), or 0.034 lb PM10/MMbtu. [District NSR Rule] <br /> Federally Enforceable Through Title V Permit <br /> 13. The facility shall install and maintain in proper operating condition a gas flow meter with a continuous recording <br /> device which measures the amount of landfill gas consumed per day. [District NSR Rule] Federally Enforceable <br /> Through Title V Permit <br /> PERMIT UNIT REQUIREMENTS CONTINUE ON NEXT PAGE <br /> These terms and conditions are part of the Facility-wide Permit to Operate. <br /> Facility Name: FORWARD,INC.LANDFILL <br /> Location: 9999 S.AUSTIN ROAD,MANTECA,CA 95336 <br /> N-]36.17.7.. .zona 4:4"--StON0004 <br />