Laserfiche WebLink
Permit Unit Requirements for N-339-17-7 (continued) Page 3 of 6 <br /> 31. The permittee shall notify the APCO by telephone at least 24 hours before performing any maintenance work that <br /> requires the system to be shutdown. The notification shall include a description of work,the date work will be <br /> performed and the amount of time needed to complete the maintenance work. [District NSR Rule] Federally <br /> Enforceable Through Title V Permit <br /> 32. Permittee shall maintain records of system inspections including: date,time and inspection results. [District Rule 1070] <br /> Federally Enforceable Through Title V Permit <br /> 33. Permittee shall maintain records of maintenance related or other collection system and control device downtime, <br /> including individual well shutdown. [District Rule 1070]Federally Enforceable Through Title V Permit <br /> 34. The operator shall record emission control device source tests(emissions of CO,NOx, and VOC)in pounds per <br /> MMbtu heat input.Operator shall also record VOC destruction/treatment efficiency. [District Rule 1081] Federally <br /> Enforceable Through Title V Permit <br /> 35. Permittee shall maintain daily records of landfill gas flow rate to the flare. [District Rule 1070] Federally Enforceable <br /> Through Title V Permit <br /> 36. Permittee shall maintain annual records of landfill gas flow rate to the flare. [District NSR Rule] Federally Enforceable <br /> Through Title V Permit <br /> 37. All records shall be retained for a period of at least 5 years and shall be made available for District inspection upon <br /> request. [District Rule 1070] Federally Enforceable Through Title V Permit <br /> 38. The NMOC emission rate shall be calculated using the equation in 40CFR60.754(a)(1)(i), if the actual year-to-year <br /> solid waste acceptance rate is known or the equation in 40CFR60.754(a)(1)(ii),if the actual year-to-year solid waste <br /> acceptance rate is unknown. The values for k,Lo, and CNMOC for both equations shall be taken from <br /> 40CFR60.754(a)(1),as appropriate. Both equations may be used if the actual year-to-year acceptance rate is known <br /> for a part of the landfill life,but unknown for another part of the landfill life. The mass of nondegradable solid waste <br /> may be subtracted from the average annual acceptance rate when calculating R,if documentation of the nature and <br /> amount of such wastes is maintained. (Tier 1 specifications) [40 CFR 60.754(a)(1)] Federally Enforceable Through <br /> Title V Permit <br /> 39. If the calculated NMOL emission rate is equal to or greater than 50 megagrams/year,then the landfill owner or <br /> operator shall either comply with the requirements of this permit to submit a collection and control design plan and <br /> install the system,or determine a site-specific NMOC concentration and recalculate the NMOC emission rate using <br /> Tier 2 specifications. [40 CFR 60,754(a)(2)(ii)]Federally Enforceable Through Title V Permit <br /> 40. Tier 2 specifications to determine the site-specific NMOC concentration shall include the following: 1)For sampling, <br /> at least 2 sample probes shall be installed per hectare of landfill surface that has retained waste for at least 2 years,up <br /> to a maximum of 50 required probes. One sample of landfill gas shall be collected from each probe to determine the <br /> NMOC concentration,using EPA Method 25,25C,another method approved by the EPA,or 18, in accordance with 40 <br /> CFR 60.754(a)(3). If EPA Method 18 is used,the minimum list of compounds to be tested shall be those published in <br /> the most recent Compilation of AP-42. If composite sampling is used,equal sample volumes are required. All <br /> samples taken shall be used in the analysis. The NMOC concentration from Method 25 or 25C shall be divided by 6 to <br /> convert from C-NMOC,as carbon to as hexane.2)For landfills equipped with active collection systems, samples may <br /> be collected from the common header pipe before gas moving or condensate removal equipment;a minimum of 3 <br /> samples must be collected. [40 CFR 60.754(x)(3),(a)(5)]Federally Enforceable Through Title V Permit <br /> 41. Tier 2 specifications to determine the site-specific NMOC concentration shall include the following: 1)The NMOC <br /> mass emission rate shall be recalculated using the average site-specific concentration, instead of the default value,2)If <br /> the resulting calculated mass emission rate is equal to or greater than 50 megagrams/year,the landfill owner or <br /> operator shall either comply with 60.752(b)(2),or determine a site-specific methane generation rate constant and <br /> recalculate the NMOC emission rate using Tier 3 specifications. [40 CFR 60.754(a)(3)(i)&(ii)] Federally Enforceable <br /> Through Title V Permit <br /> PERMIT UNIT REQUIREMENTS CONTINUE ON NEXT PAGE <br /> These terms and conditions are part of the Facility-wide Permit to Operate. <br /> Facility Name: FORWARD,INC.LANDFILL <br /> Location: 9989 S.AUSTIN ROAD,MANTECA,CA 95336 <br /> N34Pt7.7:J-14 pppp 4:42PM-$10NO J <br />