Laserfiche WebLink
Forward Landfill PCPCMP 11 <br />L:\Allied\2000.193\Reports\Finalpcpcmp\FL-Toc.Doc:08/22/01 BRYAN A. STIRRAT & ASSOCIATES <br />PRELIMINARY CLOSURE AND <br />POST -CLOSURE MAINTENANCE PLAN <br />FOR THE <br />FORWARD LANDFILL <br />TABLE OF CONTENTS <br />SECTION <br />PAGE <br />3.2 <br />Final Cover <br />3-1 <br />3.2.1 Regulatory Design Standards <br />3-1 <br />3.2.2 Proposed Final Cover Design <br />3-2 <br />3.2.2 Final Cover Construction <br />3-4 <br />3.2.3 Sources of Cover Material <br />3-5 <br />3.2.4 Final Cover Construction Quality Assurance <br />3-5 <br />3.3 <br />Final Grading <br />3-5 <br />3.4 <br />Landfill Settlement <br />3-6 <br />3.4.1 Settlement Analysis <br />3-6 <br />3.4.2 Survey/Settlement Monumentation <br />3-7 <br />3.5 <br />Landfill Slope Stability <br />3-7 <br />3.6 <br />Drainage and Erosion Control <br />3-8 <br />3.6.1 Drainage Control System Design <br />3-8 <br />3.6.1.1 Hydrology <br />3-8 <br />3.6.1.2 Proposed Final Drainage Control System <br />3-9 <br />3.6.2 Soil Loss Analysis <br />3-9 <br />3.6.3 Erosion Control <br />3-10 <br />3.7 <br />Leachate Treatment <br />3-11 <br />3.8 <br />Landfill Gas Control <br />3-11 <br />3.9 <br />Landfill Gas Monitoring System <br />3-13 <br />3.10 <br />Groundwater/Surface Water Monitoring System <br />3-13 <br />3.11 <br />Site Security <br />3-14 <br />3.12 <br />Removal of Existing Structures <br />3-14 <br />3.13 <br />Decommissioning of Environmental Control systems <br />3-15 <br />3.14 <br />Closure Implementation Schedule <br />3-16 <br />4.0 POST -CLOSURE MAINTENANCE PLAN <br />4-1 <br />4.1 <br />Introduction <br />4-1 <br />4.2 <br />Final Cover Maintenance <br />4-1 <br />4.3 <br />Drainage System Maintenance <br />4-1 <br />Forward Landfill PCPCMP 11 <br />L:\Allied\2000.193\Reports\Finalpcpcmp\FL-Toc.Doc:08/22/01 BRYAN A. STIRRAT & ASSOCIATES <br />