Laserfiche WebLink
PRELIMINARY CLOSURE AND <br />POST -CLOSURE <br />. .•..R MAINTENANCE <br />FORTHE <br />FORWARD LANDFILL <br />TABLE OF CONTENTS <br />SECTION <br />PAGE <br />4.4 <br />Vegetative Cover Maintenance <br />4-2 <br />4.5 <br />Leachate Control System Maintenance <br />4-2 <br />4.6 <br />Landfill Gas Monitoring and Control System Maintenance <br />4-3 <br />4.7 <br />Groundwater Monitoring and Control System Maintenance <br />4-3 <br />4.8 <br />Access Road Maintenance <br />4-4 <br />4.9 <br />Site Security Inspection and Maintenance <br />4-4 <br />4.10 <br />Landfill Settlement Monitoring and Maintenance <br />4-5 <br />4.10.1 Survey Record <br />4-5 <br />4.10.2 Survey/Settlement Monuments <br />4-5 <br />5.0 CLOSURE/POST-CLOSURE MAINTENANCE COST ESTIMATE <br />5-1 <br />5.1 <br />Introduction <br />5-1 <br />5.2 <br />Closure Cost Estimate <br />5-1 <br />5.2.1 Final Cover <br />5-1 <br />5.2.2 Final Cover Construction Quality Assurance Monitoring <br />and Testing <br />5-1 <br />5.2.3 Drainage Control System <br />5-2 <br />5.2.4 Erosion Control <br />5-2 <br />5.2.5 Landfill Gas Control System <br />5-2 <br />5.2.6 Landfill Gas Monitoring System <br />5-2 <br />5.2.7 Groundwater Monitoring System <br />5-2 <br />5.2.8 Site Security/Signage <br />5-2 <br />5.2.9 Structure Removal/Decommissioning of Environmental <br />Control Systems <br />5-3 <br />5.2.10 Engineering Design <br />5-3 <br />5.2.11 Construction Management <br />5-3 <br />5.2.12 Final Closure and Post -Closure Maintenance Plan (FCPCMP) <br />Preparation <br />5-3 <br />5.2.13 Contingency <br />5-3 <br />5.3 <br />Post -Closure Maintenance Cost Estimate <br />5-3 <br />5.4 <br />Demonstration of Financial Responsibility <br />5-4 <br />6.0 PROFESSIONAL CERTIFICATION OF ACCURACY <br />40 <br />Forward Landfill PCPCMP Ill <br />L:\Allied\2000.193\Reports\Finalpcpcmp\FL-Toc. Doc:08/22/01 <br />6-1 <br />BRYAN A. STIRRAT S. ASSOCIATES <br />