Laserfiche WebLink
PRELIMINARY CLOSUREAND <br />POST -CLOSURE MAINTENANCE <br />FOR THE <br />FORWARD LANDFILL <br />4619IQ: aIFA-0m? <br />Table 1 Summary of Site Areas <br />Table 2 Diminishing Landfill Capacity <br />Table 3 Summary of Groundwater Monitoring Wells — Existing Forward Landfill <br />Table 4 Summary of Groundwater Monitoring Wells — Existing Austin Road Landfill <br />Table 5 Proposed Groundwater Monitoring Well Network <br />Table 6 Proposed Water Quality Monitoring Program <br />Table 7 Proposed Vadose Zone and Surface Water Monitoring Network <br />Table 8 Closure Cost Estimate Summary <br />Table 9 Annual Post -Closure Maintenance and Monitoring Cost Estimate <br />Summary <br />Figure 1 Adjacent Land Uses <br />Figure 2 Borings/Surface Water Monitoring Points and Existing and Proposed <br />Groundwater Wells Location Map Aft <br />IV <br />LIST OF APPENDICES <br />Appendix A Construction Quality Assurance <br />Appendix B Financial Assurance Documentation <br />Forward Landfill PCPCMP Iv <br />Z:\PROJECTS\Allied Waste\Forward\JN81013 5 yr Review Plan\PCPCMP Amend 4 July 08\Table of Cont.doc <br />Amendment No. 4: 08/07/08 <br />