My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2001_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2001_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:48:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2001_2
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2001_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
853
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 3.14 CLOSURE IMPLEMENTATION SCHEDULE <br />As discussed in Section 1.5, the Forward Landfill is expected to reach capacity in <br />the year 2020. As required by 27 CCR, Section 21780 (c)(2), a FCPCMP will be <br />submitted for approval two years prior to the anticipated date of closure. In <br />accordance with 27 CCR, Section 21110, closure activities will then commence <br />within 30 days following the last receipt of waste and will conclude within 180 <br />days following the beginning of closure, or in accordance with an alternate <br />schedule approved by the LEA and the CIWMB and included in the FCPCMP. <br />Closure construction will begin with mobilization of equipment and materials. <br />The type of equipment and required personnel expected to be utilized during <br />closure construction includes but is not limited to, the following: <br />• Equipment <br />- Scrapers <br />- Dozers <br />- Loaders <br />- Compactors <br />- Trucks <br />- Soil Screening Equipment <br />- Motor Grader <br />Water Truck <br />• Personnel <br />- Construction Manager <br />- Field Inspector(s) <br />- Engineer(s) <br />- Geotechnical Engineer/Geologist <br />Geotechnical Technician(s) <br />- Labor Crews <br />- Equipment Operators <br />Surveyors <br />- Mechanics <br />Forward Landfill PCPCMP 3-16 <br />L:\Allied\2000.193\Reports\FinaIPCPCMP:FL-sec3: 8/20/01 BRYAN A. STIRRAT s ASSOCIATE£ <br />
The URL can be used to link to this page
Your browser does not support the video tag.