My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2001_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2001_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:48:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2001_2
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2001_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
853
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 4.0 POST -CLOSURE MAINTENANCE PLAN <br />4.1 INTRODUCTION <br />Post -closure maintenance of the closed Forward Landfill will be performed in <br />accordance with applicable regulatory standards included in 27 CCR, Chapters 3 <br />and 4, and 40 CFR Section 258.61. Post -closure maintenance activities for the <br />Forward Landfill will consist of: <br />• Final Cover Maintenance <br />• Drainage System Maintenance <br />• Vegetative Cover Maintenance <br />• Leachate Control System Maintenance <br />• Gas Monitoring and Control Systems `fvMaintenance <br />• Groundwater Monitoring System Maintenance <br />• Access Road Maintenance <br />• Site Security Inspection and Maintenance <br />• Landfill Settlement Monitoring and Monument Maintenance s <br />The maintenance procedures for each of these activities are described in the <br />following sections. <br />4.2 FINAL COVER MAINTENANCE <br />The integrity and effectiveness of the final cover will be maintained by making <br />repairs, if necessary, to correct the effects of settlement, subsidence, erosion, or <br />damage to the vegetation. Areas that show evidence of damage will be <br />investigated to ascertain the cause of the damage before repairs are undertaken. If <br />the damaged areas have caused ponding of surface runoff, soil will be added as <br />needed and regraded until positive drainage is re-established. If the repaired area <br />is large enough, it will be revegetated. Inspections of the final cover will be <br />performed on a quarterly basis. <br />4.3 DRAINAGE SYSTEM MAINTENANCE <br />Post -closure maintenance personnel at the landfill will inspect and maintain the <br />drainage system at the landfill on a quarterly basis and after significant storm <br />Forward Landfill PCPCMP 4-1 <br />L:\Allied\2000.193\Reports\FinaIPCPCMP:FL-sec4: 8/20/01 BRYAN A. STIRRAT S. ASSOCIATES <br />
The URL can be used to link to this page
Your browser does not support the video tag.