My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2001_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2001_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:48:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2001_2
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2001_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
853
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Leachate quantityand quality will be monitored at least quarterly or whenever <br />groundwater samples are collected. The volume of leachate conveyed and the <br />depth of the leachate over the liner shall be measured and recorded at least <br />quarterly. Representative samples of leachate and any fluid recovered in the leak <br />detection system/vadose zone sumps will be tested for the same chemical <br />parameters as required by the groundwater monitoring program. Reports will be <br />filed with the LEA, CIWMB and the RWQCB within 90 days of sampling. <br />4.6 LANDFILL GAS MONITORING AND CONTROL SYSTEM MAINTENANCE <br />Landfill gas extraction system monitoring will include collection system, flare and <br />extraction well monitoring in accordance with 27 CCR, Sections'20921, 20923, <br />20925, 20931, 20932 and 20933. The landfill gas extraction system monitoring <br />will be conducted monthly throughout the post -closure period, unless <br />authorization to cease monitoring is granted by the San Jtaaquin Valley Air <br />Pollution Control District (SJVAPCD), LEA and CIWMB. Landfill gas monitoring <br />results will be reported to the SJVAPCD, LEA and CIWMB wit'hin"90 days of <br />4Ps sampling. <br />Perimeter probe monitoring for total organics as methane..will be..performed <br />quarterly at the proposed gas monitoring wells. In the event that perimeter <br />monitoring shows that methane gas is being produced at`levels'above'the LE -L or <br />greater than 5 percent by volume in air, the existing LFGES will be evaluated and <br />modified if necessary. <br />During surface integrity testing the gas monitoring well network will be visually <br />inspected for damage and/or malfunction. 1n addition, the gas monitoring probes <br />will be periodically inspected and maintained in accordance with the <br />manufacturers specifications. If damage or malfunctioning is detected during <br />visual inspection and/or routine maintenance, the probe and/or well will be <br />immediately repaired. These procedures will assure proper functioning of the <br />landfill gas well network through the post -closure maintenance period. <br />4.7 GROUNDWATER MONITORING AND CONTROL SYSTEM MAINTENANCE <br />Groundwater monitoring will be conducted on a quarterly basis for parameters as <br />required by the regulations in force at the time of closure. <br />Forward Landfill PCPCMP 4-3 <br />L:\Allied\2000.193\Reports\FinaiPCPCMP:FL-sec4: 8/20/01 ORYAN A. STIRRAT S ASSOCIATE£ <br />
The URL can be used to link to this page
Your browser does not support the video tag.