Laserfiche WebLink
topographic map will be generated to provide an up-to-date contour map of the <br />6 disposal area. The settlement and lateral movement of each monument will then <br />C <br />El <br />be recorded. <br />Prior to a scheduled survey of the monuments, an inspection will be performed <br />to ensure that the monuments are intact and usable. The monument will be <br />cleared of all debris and vegetation to allow for visual location of the monument <br />and accurate readings. Should a monument be damaged or missing, a new <br />monument will, be placed at that location so that the continuity of the previous <br />survey data will be maintained. <br />If a monument is within an area requiring regrading and/or other reconstruction, <br />it shall be replaced at approximately the same horizontal location and a note <br />shall be placed to identify the new elevation. <br />Forward Landfill PCPCMP 4-6 <br />L:\Allied\2000.193\Reports\FinaIPCPCMP:FL-sec4: 8/20/01 BRYAN A. STIRRAT 6 ASSOCIATES <br />