5.0 • •COST ESTIMATE 4) <br />l I A 061DIF101frou <br />In order to establish the basis for the proper level of funding to close and <br />provide post -closure maintenance for the Forward Landfill in an <br />environmentally sound manner, a cost estimate has been prepared reflecting <br />the proposed closure design and post -closure maintenance procedures <br />presented in Sections 3.0 and 4.0 of this PCPCMP. The estimate for closure <br />improvements was combined with an estimate for construction <br />management/quality assurance services to determine the total closure cost. <br />5.2 CLOSURE COST ESTIMATE <br />As discussed in Section 1.4, the approved closure cost estimate for the site is <br />based on the maximum extent of closure, which will ever require closure over <br />the life of the landfill as allowed under 27 CCR. The closure cost estimate for <br />the maximum extent of closure serves as basis to fund the closure account <br />over the life of the landfill. The associated closure cost estimate reflects third <br />party costs in 2008 dollars and is presented on Table 8. The maximum extent <br />of area which will ever close over the course of the active life of the landfill is <br />187.6 acres. Allied is and will continue to closure the Forward Landfill in a <br />number of smaller closure phases. The initial partial closure project was an <br />area known as Stage 1A. A Partial Final Closure/Post-Closure Maintenance <br />Plan (dated June 2005) for this stage was prepared and submitted to the <br />regulatory agencies with closure activities being completed in 2005. <br />5.3 POST -CLOSURE MAINTENANCE COST ESTIMATE <br />The post -closure maintenance cost estimate has been prepared utilizing <br />information contained in Section 4.0 and estimates of manpower, materials <br />and equipment to maintain the Forward Landfill in compliance with current <br />applicable regulations. <br />The total annual maintenance and monitoring cost estimate for post -closure is <br />shown on Table 9. The costs shown on Table 9 include labor, equipment, and <br />0 <br />Forward Landfill PCPCMP 5-1 <br />z:\PROJECTS\Allied Waste\Forward\JN81013 5 yr Review Plan\PCPCMP Amend 4 July 08\Section 5.doc <br />Amend. No. 4: 8/7/08 <br />