Laserfiche WebLink
n <br />U <br />materials. These costs are projected in 2008 dollars, assuming no change in <br />the regulatory environment with respect to the Forward Landfill. 0 <br />It should be noted that the maintenance and monitoring costs presented have <br />been projected utilizing current regulations and applicable requirements. In <br />the event that changes occur in the regulatory conditions pertaining to the <br />Forward Landfill, these estimates will be adjusted accordingly, if necessary, <br />and submitted to the CIWMB, EA and RWQCB. <br />Closure/Post-Closure/Corrective Action Program (CAP) Maintenance Fund <br />In accordance with 27 CCR, Chapter 6 and 40 CFR, Part 258, Subpart G, an <br />operator must demonstrate financial assurance for the closure, post -closure <br />maintenance, and groundwater corrective action for reasonably foreseeable <br />releases at a landfill. The financial assurance mechanism in the form of a <br />Certificate of Insurance is in place for the Forward Landfill (see documentation <br />included in Appendix B). <br />Forward Landfill PCPCMP 5-2 <br />Z:\PROJECTS\Allied Waste\Forward\JN81013 5 yr Review Plan\PCPCMP Amend 4 July 08\Section 5.doc <br />Amend. No. 4: 8/7/08 <br />