My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2001_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2001_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:48:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2001_2
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2001_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
853
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. 5:9_ CLOSURE/POST-CLOSURE MAINTENANCE COST ESTIMATE <br />5.1 INTRODUCTION <br />In order to establish the basis for the proper level of funding to close and <br />provide post -closure maintenance for the Forward Landfill in an environmentally <br />sound manner, a cost estimate has been prepared reflecting the proposed <br />closure design and post -closure maintenance procedures presented in Sections 3 <br />and 4 of this PCPCMP. The estimate for closure improvements was combined <br />with an estimate for constrmctfoii management�gaality assurance services -to <br />determine the total closure cost. <br />5.2 CLOSURE COST ESTIMATE <br />The Plan features are group`ed'into-categories°for convenience in presenting -the <br />cost estimate. A brief description of the components included in each category <br />is given below. The total closure cost estimate is shown on Table 8. <br />G 5.2.1 FINAL COVER <br />• <br />Based on the proposed final grading plan, the approximate area which will <br />require placement of final cover is 347 acres. The proposed final cover for the <br />Forward Landfill will consist of a minimum two -foot thick foundation -layer of <br />approved soil, contaminated soil, incinerator ash, or other waste materials placed <br />immediately over the entire surface of the last lift of refuse; a VFPE <br />geomembrane which is equal to the least permeable portion of the liner system; <br />HDPE geosynthetic drainage strips and a two -foot erosion control (vegetative) <br />layer. <br />5.2.2 FINAL COVER CONSTRUCTION QUALITY ASSURANCE MONITORING AND <br />TESTING <br />Costs for construction quality assurance include the final cover placement tests, <br />inspections and reporting. <br />Forward Landfill PCPCMP 5-1 <br />L:\Allied\2000.193\Reports\FinaIPCPCMP:FL-sec5: 8/22/01 BRYAN A. STIRRAT 6 ASSOCIATES <br />
The URL can be used to link to this page
Your browser does not support the video tag.