• <br />The total annual maintenance and monitoring cost estimate for post -closure is <br />shown on Table 9. These costs are projected in 2001 dollars, assuming no change <br />in the regulatory environment with respect to the Forward Landfill. The total 30 - <br />year post -closure maintenance cost estimate shown on Table 9, was calculated by <br />multiplying the annual cost estimate by 30. The total 30 -year post closure cost <br />obligation does not factor in inflation or interest over the funding period. The <br />actual future value of the 30 -year total may be different. Annual funding will be <br />calculated year to year in accordance with 27CCR, Section 22225. <br />It should be noted that the maintenance and monitoring costs presented have <br />been projected utilizing current regulations and applicable requirements. 4n -the <br />event that changes occur in the regulatory conditions pertaining to the Forward <br />Landfill, these estimates will be adjusted accordingly, if necessary, and submitted <br />to the CIWMB, EA and RWQCB. <br />5.4 DEMONSTRATION OF FINANCIAL RESPONSIBILITY <br />Closure/Post-Closure/Corrective Action Program (CAP) Maintenance Fund <br />In accordance with 27 CCR, Chapter 6 and 40 CFR, Subpart G, an operator must <br />demonstrate financial assurance for the proper closure, post -closure <br />maintenance and groundwater corrective action for reasonably foreseeable <br />releases at a landfill. Financial assurance mechanisms in the form of Certificates of <br />Insurance are in-place for the existing Austin.. Road.IandfiU,and..existing Forward <br />Landfill individually. Financial assurance for the combined Forward Landfill facility <br />is to be prepared. <br />Forward Landfill PCPCMP 5-4 <br />L:\Allied\2000.193\Reports\FinaiPCPCMP:FL-sec5: 8/22/01 <br />BRYAN A. STIRRAT 6. ASaSQli::l,Ale'ES <br />