Laserfiche WebLink
L <br />l <br />FORWARD <br />R l 11 1 , <br />CLOSURE <br />•. <br />7.6 -ACRE CLOSURE AREA I <br />ITEM <br />DESCRIPTION <br />QUANTITY <br />UNIT PRICE <br />ESTIMATED <br />COST <br />1 <br />PRE -CONSTRUCTION <br />1 LS <br />Mobilization 1.0 LS $200,000.00 $200,000 <br />$1,824,675 <br />Construction Surveying 1.0 LS $60,000.00 $60,000 <br />3 NAL COVER CONSTRUCTION QUALITY ASSURANCE <br />Personnel/Monitorin /Re ortin 4 1 LS $433,433.00 $433,433 <br />Veld <br />Subtotal $433.433 <br />4 <br />DRAINAGE CONTROL SYSTEM <br />Subtotal <br />$260,000 <br />FINAL COVER 1 <br />See Attachment 2, back-up sheet for detailed <br />1 LS <br />$1,824,675.00 <br />$1,824,675 <br />Lined Landfill Areas 93.8 acres <br />breakdown. <br />Preliminary Grading <br />4,196,248 <br />sf <br />$0.10 <br />$419,625 <br />Foundation Layer 2' thickness - 1' existin (2 )(3) <br />155,576 <br />c <br />$2.15 <br />$334,488 <br />Barrier Layer 40 -mil LLDPE Geomembrane <br />4,196,248 <br />sf <br />$0.48 <br />$2,014,199 <br />Drainage Layer HDPE strip drains 10% coverage) <br />419,624 <br />sf <br />$0.70 <br />$293,737 <br />Vegetative Layer 2' thickness <br />307,063 <br />c <br />$2.03 <br />$623,338 <br />Unlined Landfill Areas 93.8 acres <br />Preliminary Grading <br />4,196,248 <br />sf <br />$0.10 <br />$419,625 <br />Foundation Layer 2' thickness - 1' existing) (2 )(3) <br />155,576 <br />c <br />$2.15 <br />$334,488 <br />Low -permeability Layer (1'thickness) <br />155,576 <br />cy 1 <br />6.75 1 <br />$1,050,138 <br />Vegetative Layer 2' thickness) <br />307,063 <br />c <br />$2.15 <br />$660,185 <br />Survey monument installation <br />2 <br />ea <br />Subtotal <br />$6,151,524 <br />3 NAL COVER CONSTRUCTION QUALITY ASSURANCE <br />Personnel/Monitorin /Re ortin 4 1 LS $433,433.00 $433,433 <br />Veld <br />Subtotal $433.433 <br />4 <br />DRAINAGE CONTROL SYSTEM <br />See Attachment 1, back-up sheet for detailed <br />breakdown. <br />T1 LS$297,473.00 <br />$297,473 <br />RM, <br />Subtotal <br />187.6 acres $1,630.00 <br />187.6 acres $3,000.00 <br />Subtotal <br />$305,788 <br />$562,800 <br />$868.588 <br />6 <br />GAS CONTROL SYSTEM <br />See Attachment 2, back-up sheet for detailed <br />1 LS <br />$1,824,675.00 <br />$1,824,675 <br />breakdown. <br />Forward Landfill PCPCMPR <br />Z:\PROJECTSWIIied Waste\Forward\JN81013 5 yr Review Plan\PCPCMP Amend 4 July 08\Table 8 Clos Cst; Amend No. 4: 8/7/2008 <br />Page 1 of 2 <br />