C <br />FORWARD <br />CLOSURE•` • <br />187.6 -ACRE <br />. CLOSURE AREA <br />Notes: <br />(1) The unit costs for the synthetic final cover materials and installation, drainage control system features and erosion control are <br />based on a recent bid (May 2008) prepared by Boston Pacific, Inc for remediation and closure work at the Jamestown Landfill located <br />in the same general region (See Attachment No. 1). <br />(2) Unit costs includes excavation, preparation and compaction of the foundation and vegetative layers. Earthwork pricing is based <br />on a recent bid provided by Guinn Construction to Allied for their last lined cell to be constructed in 2008 (See Attachment No. 1). Cost <br />also assumed that all materials necessary for the foundation, low -permeable and vegetative layers will be obtained from an on-site <br />borrow source. Cost also assumes 50% of total final area as slope and a slope factor of 3:1 horizontal to vertical. <br />(3) Cost assumes that only one foot of random soil would need to be placed for the foundation layer because one -foot of soil would <br />Alft already be in place. Cost also assumes scarification and recompaction of the lower in-place foot of soil as part of the preliminary <br />grading cost item. <br />(4) Final cover construction quality assurance (CQA) is generally based on the actual number of construction days to complete the <br />cap. Based on the closure implementation schedule, approximately 130 construction days will be needed to install the final cover over <br />the 187.6 -acre closure area. The per day CQA utilized for this estimate was provided by one of Allied's professional CQA consultants <br />(Geologic Associates). The per day cost for a CQA professional, equipment, and vehicle is $1,500. Laboratory sampling and testing <br />is based on quantities of final cover soil and synthetic in accordance with the sampling/testing frequency outlined in the CQA Plan in <br />the 2002 PCPCMP and current regulations under 27CCR and the cost per test provided by GeoLogic Associates for earthwork and <br />Precision Labs for synthetics. Geosynthetic testing frequencies are established by the Geosynthetic Research Institute and are <br />completed at rate of 1 test every 100,000 sq ft. Laboratory costs are estimated to be $218,433. In addition, the final CQA report <br />certifying proper installation of the cap is another $20,000. <br />(5) All on-site structures associated with the landfill will be removed. An administration/maintenance office trailer, as well as an <br />equipment maintenance area, will be utilized during the post -closure maintenance period. <br />(6) No cost is included in this category because the system is/will be in-place at closure. Currently, there are no plans to expand <br />the monitoring system. <br />(7) Cost is for engineering design and preparation of construction documentation (plans and specifications) for bid purposes. <br />(8) Cost is for monitoring contractors work, coordinating CQA activities, meetings, liaison between design engineers and <br />contractors, etc. <br />11 <br />Forward Landfill PCPCMPR <br />Z:\PROJECTSWIIied Waste\ForwardUN81013 5 yr Review Plan\PCPCMP Amend 4 July 08\Table 8 Clos Cst; Amend No. 4: 8/7/2008 Page 2 of 2 <br />ESTIMATED <br />ITEM <br />DESCRIPTION <br />QUANTITY <br />UNIT PRICE <br />COST <br />($) <br />11 <br />1 ENGINEERING DESIGN (7) <br />2% of construction cost <br />1 LS <br />183 945 <br />Subtotal <br />$183,945 <br />12 <br />CONSTRUCTION MANAGEMENT (8) <br />4% of construction cost <br />1 LS <br />$367,890 <br />Subtotal <br />$367,890 <br />Total Construction Cost <br />$10,442,528 <br />Contingency 20% <br />$2,088,506 <br />Final Closure Plan Prep. <br />$40,000 <br />Total Closure Cost Estimate <br />$12,571,034 <br />Notes: <br />(1) The unit costs for the synthetic final cover materials and installation, drainage control system features and erosion control are <br />based on a recent bid (May 2008) prepared by Boston Pacific, Inc for remediation and closure work at the Jamestown Landfill located <br />in the same general region (See Attachment No. 1). <br />(2) Unit costs includes excavation, preparation and compaction of the foundation and vegetative layers. Earthwork pricing is based <br />on a recent bid provided by Guinn Construction to Allied for their last lined cell to be constructed in 2008 (See Attachment No. 1). Cost <br />also assumed that all materials necessary for the foundation, low -permeable and vegetative layers will be obtained from an on-site <br />borrow source. Cost also assumes 50% of total final area as slope and a slope factor of 3:1 horizontal to vertical. <br />(3) Cost assumes that only one foot of random soil would need to be placed for the foundation layer because one -foot of soil would <br />Alft already be in place. Cost also assumes scarification and recompaction of the lower in-place foot of soil as part of the preliminary <br />grading cost item. <br />(4) Final cover construction quality assurance (CQA) is generally based on the actual number of construction days to complete the <br />cap. Based on the closure implementation schedule, approximately 130 construction days will be needed to install the final cover over <br />the 187.6 -acre closure area. The per day CQA utilized for this estimate was provided by one of Allied's professional CQA consultants <br />(Geologic Associates). The per day cost for a CQA professional, equipment, and vehicle is $1,500. Laboratory sampling and testing <br />is based on quantities of final cover soil and synthetic in accordance with the sampling/testing frequency outlined in the CQA Plan in <br />the 2002 PCPCMP and current regulations under 27CCR and the cost per test provided by GeoLogic Associates for earthwork and <br />Precision Labs for synthetics. Geosynthetic testing frequencies are established by the Geosynthetic Research Institute and are <br />completed at rate of 1 test every 100,000 sq ft. Laboratory costs are estimated to be $218,433. In addition, the final CQA report <br />certifying proper installation of the cap is another $20,000. <br />(5) All on-site structures associated with the landfill will be removed. An administration/maintenance office trailer, as well as an <br />equipment maintenance area, will be utilized during the post -closure maintenance period. <br />(6) No cost is included in this category because the system is/will be in-place at closure. Currently, there are no plans to expand <br />the monitoring system. <br />(7) Cost is for engineering design and preparation of construction documentation (plans and specifications) for bid purposes. <br />(8) Cost is for monitoring contractors work, coordinating CQA activities, meetings, liaison between design engineers and <br />contractors, etc. <br />11 <br />Forward Landfill PCPCMPR <br />Z:\PROJECTSWIIied Waste\ForwardUN81013 5 yr Review Plan\PCPCMP Amend 4 July 08\Table 8 Clos Cst; Amend No. 4: 8/7/2008 Page 2 of 2 <br />