Laserfiche WebLink
Attachment 1 <br />Final Closure Construction Cost Estimate for the Jamestown Landfill - 2008 <br />Boston Pacific, Inc. <br />'ROJECTS\Allied Waste\JN81013 5 yr Review Plan\PCPCMP Amend 3 MY 08\Boston Pacific <br />Item <br />NO.Item <br />Mobilization <br />Unit <br />Est. Qty <br />Unit Price <br />Total <br />2 <br />Temporary Water supply <br />LS <br />LS <br />1 <br />1 <br />$201,800.00 <br />$201,800.00 <br />Construction Surveying <br />LS <br />$58,000.00 <br />$58,000.00 <br />4 <br />Traffic Control <br />LS <br />1 <br />1 <br />$65,200.00 <br />$65,200.00 <br />5 <br />Temporary Erosion and <br />$20,400.00 <br />$20,400 <br />00. <br />Sedimentation Control <br />LS <br />1 <br />$27,500.00 <br />$27,500.00 <br />6 <br />Construct Temporary Construction <br />Entrance <br />EA <br />2 <br />$2,150.00 <br />$4,300.00 <br />7 <br />Cleaning and Grubbing <br />ACRE <br />18 <br />$5,400.00 <br />8 <br />Remove Existing Drainage System <br />LS <br />1 <br />$97,200.00 <br />$27,300.00 <br />$27,300.00 <br />9 <br />Disconnect, Protect and Reconnect <br />Existing Leachate Piping <br />LS <br />1 <br />$4,560.00 <br />$4,560.00 <br />10 <br />Remove Existing Temporary <br />Geos nthetic Slope Protection <br />LS <br />1 <br />$3,510.00 <br />$3,510.00 <br />Disposal of Geosynthetic Slope <br />11 <br />Protection and Drainage Materials <br />LS <br />1 <br />$4,560.00 <br />On -Site <br />$4,560.00 <br />12 <br />Removal of Existing Landfill Gas Wells <br />EA <br />6 <br />$325.00 <br />$1,950.00 <br />13 <br />Removal of Existing Landfill Gas Vents <br />EA <br />1g <br />$325.00 <br />$5,850.00 <br />14 <br />Excavate and Stockpile Existing <br />Vegetative Soil Layer <br />Excavate <br />CY <br />46,020 <br />$2.68 <br />$123,333.60 <br />15 <br />and Stockpile Existing <br />Monolithic Clay Layer <br />CY <br />48,070 <br />$2.55 <br />$122,578.50 <br />16 <br />Excavate and Stockpile Existing <br />Foundation Layer <br />CY <br />18,025 <br />$2.55 <br />$45,963.75 <br />17 <br />Excavate, Relocate and Compact <br />Refuse <br />CY <br />105,975 <br />$3.94 <br />$417,541.50 <br />18 <br />Excavate, Process and Stockpile On- <br />site Borrow <br />CY <br />60,000 <br />$8.20 <br />$492,000.00 <br />19 <br />Import Material from Off -Site Mine <br />CY <br />15,000 <br />$5.30 <br />20 <br />Prepare Buttress Foundation <br />CY <br />850 <br />$79,500.00 <br />21 <br />Construct Buttress <br />CY <br />1 <br />37,500 <br />$5.70 <br />$2.90 <br />$4,845.00 <br />$108,750.00 <br />22 <br />Place and Compact Foundation Layer <br />CY <br />40,398 <br />$6.50 <br />$262,587.00 <br />23 <br />Install Passive Landfill Gas Wells <br />VLF <br />700 <br />$83.00 <br />$58,100.00 <br />24 <br />Passive LFG Vent/Well Surface <br />Completions <br />EA <br />50 <br />$290.00 <br />$14,500.00 <br />25 <br />Install Passive Landfill Gas Trenches <br />and Vents <br />LF <br />8,000 <br />$26.10 <br />$208,800.00 <br />Install Low Permeability Barrier (40- <br />mil Textured LLDPE Geomembrane) <br />SF <br />726,462 <br />$0.48 <br />$348,701.76 <br />Install Geocomposite Drainage Layer <br />Double -Sided <br />SF <br />726,462 <br />$0.70 <br />$508,523.40 <br />'ROJECTS\Allied Waste\JN81013 5 yr Review Plan\PCPCMP Amend 3 MY 08\Boston Pacific <br />