Attachment 1
<br />Final Closure Construction Cost Estimate for the Jamestown Landfill - 2008
<br />I1Boston Pacific, Inc.
<br />Item
<br />No.
<br />28
<br />Item
<br />Construct Geocomposite Tie -In to
<br />Unit Est. Qt y Unit
<br />Price
<br />Total
<br />Drainage System 6 -inch
<br />LF 1,600
<br />$48.30
<br />$77,280.00
<br />29
<br />Construct Geocomposite Tie -In to
<br />Drainage System 4 -inch
<br />LF 6,800
<br />$33.70
<br />$ 229,160.00
<br />30
<br />Prepare, Place and Compact
<br />Vegetative Soil Layer
<br />Cy 58,864
<br />$12.80
<br />$753,459.20
<br />31
<br />Construct Access Roads
<br />LF 3,400
<br />Hydroseed and Permanent Erosion
<br />$830
<br />$28,220.00
<br />33
<br />Control
<br />ACRE 18
<br />$4,630.00
<br />$83,340.00
<br />Install surveyMonuments
<br />EA 4
<br />34
<br />Construct V -Ditch Type 1 (Concrete)
<br />LF
<br />$1,520.00
<br />$6,080.00
<br />3,400
<br />$26.30
<br />$89,420.00
<br />Construct V -Ditch Type 2 (Concrete)
<br />LF 1,700
<br />36
<br />'
<br />Construct V -Ditch Type 3 (Ripra)
<br />LF
<br />$38.50
<br />$65,450.00
<br />37
<br />Drainage Inlets for Storm Drains 2, 3,
<br />2,000
<br />$17.40
<br />$34,800.00
<br />5
<br />EA 3
<br />$2,000.00
<br />$6,000.00
<br />38
<br />Drainage Inlets for Storm Drains 1, 4,
<br />6,7
<br />EA 4
<br />$1,840.00
<br />$7,360.00
<br />39
<br />Drainage Inlets for Storm Drains 8, 9
<br />EA 2
<br />$1,990.00
<br />$3,980.00
<br />40
<br />Construct Western Outlet Structure
<br />and Apron
<br />Construct SE Basin Inlet and Riprap0
<br />LS 1
<br />$6,200.00
<br />$6,200.00
<br />41
<br />A ron
<br />LS 1
<br />$4,540.00
<br />$4,540.00
<br />42
<br />Construct SE Basin Outlet Structure
<br />and Ri rap Apron
<br />LS 1
<br />$5,100.00
<br />$5,100.00
<br />43
<br />Construct Upper Northern Outlet and
<br />Ri ra A----
<br />LS 1
<br />$1,370.00
<br />$1,370.00
<br />44
<br />Construct Lower Northern Outlet and
<br />Ri ra Apron
<br />LS 1
<br />$1,370.00
<br />$1,370.00
<br />Drainage Pipe, 24 -inch HDPE
<br />LF 70
<br />46
<br />Drainage Pipe, 18 -inch HDPE
<br />LF
<br />$46.10
<br />$3,227.00
<br />47
<br />Drainage Pipe, 12 -inch HDPE
<br />430
<br />LF
<br />$33.90
<br />$14,577.00
<br />TOTAL A
<br />480
<br />$23.00
<br />$11,040.00
<br />$4,749,827.71
<br />Highlighted items unit prices were utilized for the Forward Landfill Closure
<br />Cost Estimate
<br />Amendment No. 3. Information obtained
<br />Table
<br />from Sukut Construction,
<br />3 of PCPCMP
<br />project. This information was submitted
<br />one of the bidders on this Public Works
<br />in the form of a construction bid estimate to
<br />Jamestown Landfill, Tuolumne County.
<br />remediate
<br />and close the
<br />-0 0