Laserfiche WebLink
Attachment 1 <br />Final Closure Construction Cost Estimate for the Jamestown Landfill - 2008 <br />I1Boston Pacific, Inc. <br />Item <br />No. <br />28 <br />Item <br />Construct Geocomposite Tie -In to <br />Unit Est. Qt y Unit <br />Price <br />Total <br />Drainage System 6 -inch <br />LF 1,600 <br />$48.30 <br />$77,280.00 <br />29 <br />Construct Geocomposite Tie -In to <br />Drainage System 4 -inch <br />LF 6,800 <br />$33.70 <br />$ 229,160.00 <br />30 <br />Prepare, Place and Compact <br />Vegetative Soil Layer <br />Cy 58,864 <br />$12.80 <br />$753,459.20 <br />31 <br />Construct Access Roads <br />LF 3,400 <br />Hydroseed and Permanent Erosion <br />$830 <br />$28,220.00 <br />33 <br />Control <br />ACRE 18 <br />$4,630.00 <br />$83,340.00 <br />Install surveyMonuments <br />EA 4 <br />34 <br />Construct V -Ditch Type 1 (Concrete) <br />LF <br />$1,520.00 <br />$6,080.00 <br />3,400 <br />$26.30 <br />$89,420.00 <br />Construct V -Ditch Type 2 (Concrete) <br />LF 1,700 <br />36 <br />' <br />Construct V -Ditch Type 3 (Ripra) <br />LF <br />$38.50 <br />$65,450.00 <br />37 <br />Drainage Inlets for Storm Drains 2, 3, <br />2,000 <br />$17.40 <br />$34,800.00 <br />5 <br />EA 3 <br />$2,000.00 <br />$6,000.00 <br />38 <br />Drainage Inlets for Storm Drains 1, 4, <br />6,7 <br />EA 4 <br />$1,840.00 <br />$7,360.00 <br />39 <br />Drainage Inlets for Storm Drains 8, 9 <br />EA 2 <br />$1,990.00 <br />$3,980.00 <br />40 <br />Construct Western Outlet Structure <br />and Apron <br />Construct SE Basin Inlet and Riprap0 <br />LS 1 <br />$6,200.00 <br />$6,200.00 <br />41 <br />A ron <br />LS 1 <br />$4,540.00 <br />$4,540.00 <br />42 <br />Construct SE Basin Outlet Structure <br />and Ri rap Apron <br />LS 1 <br />$5,100.00 <br />$5,100.00 <br />43 <br />Construct Upper Northern Outlet and <br />Ri ra A---- <br />LS 1 <br />$1,370.00 <br />$1,370.00 <br />44 <br />Construct Lower Northern Outlet and <br />Ri ra Apron <br />LS 1 <br />$1,370.00 <br />$1,370.00 <br />Drainage Pipe, 24 -inch HDPE <br />LF 70 <br />46 <br />Drainage Pipe, 18 -inch HDPE <br />LF <br />$46.10 <br />$3,227.00 <br />47 <br />Drainage Pipe, 12 -inch HDPE <br />430 <br />LF <br />$33.90 <br />$14,577.00 <br />TOTAL A <br />480 <br />$23.00 <br />$11,040.00 <br />$4,749,827.71 <br />Highlighted items unit prices were utilized for the Forward Landfill Closure <br />Cost Estimate <br />Amendment No. 3. Information obtained <br />Table <br />from Sukut Construction, <br />3 of PCPCMP <br />project. This information was submitted <br />one of the bidders on this Public Works <br />in the form of a construction bid estimate to <br />Jamestown Landfill, Tuolumne County. <br />remediate <br />and close the <br />-0 0 <br />ROJECTS\Allied Waste\JN81013 5 yr Review Plan\PCPCMP Amend 3 July 08\80ston Pacific <br />