My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2001_2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2001_2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:22 PM
Creation date
7/3/2020 10:48:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2001_2
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2001_2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
853
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Manager. In addition, the CQA Officer will participate with the Landfill Engineer <br />and Geotechnical Project Director in all decisions related to design issues, which <br />arise during the course of construction. <br />The Geotechnical CQA Officer shall be responsible for overall review of <br />observation, sampling, and testing activities during construction. The CQA <br />Officer shall have prior experience serving as the CQA Officer on similar final <br />cover construction projects. Specific duties of the CQA Officer include, but are <br />not limited to the following: <br />Review of all Designs, Project Drawings, Specifications and Contractor <br />Submittals. <br />• Implementation of the Geotechnical CQA Plan including assignment and: <br />management of CQA personnel; review of field reports; and geotechnical <br />review of CQA related issues. <br />Review of design changes and coordination of such changes with the Landfill <br />Engineer. <br />• Familiarization of all Geotechnical CQA Monitors with the site and the <br />Geotechnical CQA requirements. <br />• Attendance at all CQA related meetings, (i.e., preconstruction, progress and <br />special meetings as required). <br />• Coordination of all field testing, sampling, and laboratory testing. <br />• Review of all field and laboratory test results and provide recommendations as <br />appropriate. <br />• Review all Geotechnical CQA Monitors daily reports and logs for <br />completeness and documentation. <br />• Notation of any on-site activities or conditions that could jeopardize the <br />quality or function of the final cover system and reporting of these activities <br />or conditions to the Construction Manager. <br />Designation of a Senior Geotechnical CQA Monitor to act on his/her behalf at <br />the site while he/she is absent -and operations are ongoing. <br />Reporting of any unresolved issues and/or deviations from the Geotechnical <br />CQA Plan to the Construction Manager and/or the Landfill Engineer -as <br />appropriate. <br />• Preparation of the final "As -Built" report for all completed earthwork. <br />construction activities. <br />Participation in the preparation of the Record Drawings. <br />3.3 GEOTECHNICAL CQA MONITORS <br />3.3.1 FIELD ENGINEER/FIELD GEOLOGIST <br />The Field Engineer/Field Geologist will be a representative of the Geotechnical <br />CQA Consultant and will be assigned to monitor and evaluate earth materials <br />conformance with the requirements of the Project Drawings and Specifications. <br />Each Field Engineer/Field Geologist will have specific experience in landfill <br />-6- <br />C:\2001-048\FINAL COVER CQA.DOC\08/20/01 <br />Geologic Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.