Project Specifications and compacted to a minimum of 90 percent compaction <br />relative to ASTM D1557. Maximum Density/Optimum Moisture Content Testing <br />(ASTM D 1557) will be conducted at a frequency of at least one (1) test per every <br />5,000 c.y. or as deemed necessary by the Engineer. Field compaction testing will <br />be conducted by nuclear gauge or sand cone methods at a minimum frequency of <br />one (1) test per 1,000 c.y. placed. <br />5.3 EXCAVATION AND PROCESSING <br />Selectively excavated on-site soils or approved import materials shall be screened <br />(if necessary), to exclude particles in excess of one (1) -inch within one (T) -foot of <br />the geosynthetics and three (3) -inches throughout the remainder of the fill. Fill <br />soils will be dried, and/or moisture conditioned as necessary until uniformly <br />blended material characteristics and moisture condition are attained. Processed, <br />blended and moisture conditioned materials will then be used as engineered fill. <br />No soils other than those approved by the Geotechnical CQA Consultant are to be <br />usedfor the project. <br />5.4 ACCEPTANCE CRITERIA <br />5.4.1 GENERAL <br />Where test results indicate that the lift thickness, maximum particle size, <br />homogeneity of material, moisture content or density of any portion of the work is <br />below the project requirements, that particular portion shall be reworked or <br />replaced until the required condition has been attained and the resulting product <br />meets or exceeds the requirements of the Project Specifications. Tho additional fill <br />shall be placed over an area until the existing fill has been tested horizontally and <br />vertically and determined by the Geotechnical CQA Monitor to meet the` Project <br />Earthwork Specifications. The area to be reworked will be verified by survey if <br />in the opinion of the Geotechnical CQA Monitor conditions warrant. <br />5.4.2 MOISTURE CONTENT AND DENSITY <br />If in the opinion of the Geotechnical CQA Officer or designated representative, <br />engineered fill materials which have been placed and/or are ready to be placed, do <br />not visually have a uniform and homogeneous moisture content throughout the <br />material in question, these materials will be removed, without testing, and will be <br />reprocessed and/or reworked until, in the opinion of the Geotechnical CQA <br />Officer or his/her designated representative, they meet the Project Specifications. <br />For all compacted fill materials placed, if test results indicate a relative dry <br />density of less than that required or a moisture content outside the specified limits, <br />then the area will be considered inadequate and will be reworked or replaced. <br />Any reworked areas will be retested by the Geotechnical CQA Monitor to verify <br />the reworked area meets the density and moisture content requirements. <br />-11- <br />CA2001-048TINAL COV ER CQA.DOCA08/20/01 <br />GeoLogic Associates <br />